Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mid/An/75
|
| Description |
Repair To 250 Kva Voltage Stabilizer And 100 Hp 3 Phase Induction Motor Of Unit No.01 At Lis Aryanpura.
|
| Organisation | I and FC | State Govt. and UT |
| Tender Id | 2024_IFC_259404_1 |
|
Reference Number |
MID/AN/75 |
| Tender Fee | 200 |
| EMD | 4876 |
| Tender Value | |
| Place | Aryanpura |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=961081 |
| Start Date | November 29, 2025 15:30 |
| End Date |
Expired
04/12/2025
Expired 185 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, renovation and comprehensive maintenance of etp at ctu depot no. ii, industrial area, phase 1, chandigarh. (ch. to 2215 (n.p) nrb)
Repair, renovation and comprehensive maintenance of etp at ctu depot no. ii, industrial area, phase 1, chandigarh. (ch. to 2215 (n.p) nrb)
Read moreRepair and renovation works at bungalow 01 related to change of occupancy under kunustoria area, ecl
Repair and renovation works at bungalow 01 related to change of occupancy under kunustoria area, ecl
Read moreInspection cover complete unit for traction motor type hs-15250a as per ref nos.1 to 5 of s.c. rly drawing no. c/els/lgd/tm/a2/5, alt-1.
For complete deion and other details, please refer to tender
Read moreSpecial repair of building no p-1396, p-1405 and rev work at certain unit under ge (a) jaisalmer at mil stn jaisalmer
Special repair of building no p-1396, p-1405 and rev work at certain unit under ge (a) jaisalmer at mil stn jaisalmer
Read more1507construction of cc road and drain at ward no 01 prakash rathor home to lalchand rathor home
1507construction of cc road and drain at ward no 01 prakash rathor home to lalchand rathor home
Read more1507 construction of cc road and drain at ward no 01 kailashchandra home to prakash prajapati home
1507 construction of cc road and drain at ward no 01 kailashchandra home to prakash prajapati home
Read moreRepair and maintenance of infrastructure assets in r-ii division during 2025-26.. sh - repair of damaged footpath at back lane of 91 to 100, lodhi estate under sub-division -v (r-ii).
Repair and maintenance of infrastructure assets in r-ii division during 2025-26.. sh - repair of damaged footpath at back lane of 91 to 100, lodhi estate under sub-division -v (r-ii).
Read more1507 construction of cc road and drain at ward no 01 khati panchyat nehra to mahan sab ki shop
1507 construction of cc road and drain at ward no 01 khati panchyat nehra to mahan sab ki shop
Read moreConstruction of 1 (one) no. sbdtw scheme (150 mm x 100 mm) including installation of pump motor sets and laying of distribution system etc. at south baraiya under gourangabazar g.p. under rajnagar r.d. block during the year 2025-26 (ffc fund).
Construction of 1 (one) no. sbdtw scheme (150 mm x 100 mm) including installation of pump motor sets and laying of distribution system etc. at south baraiya under gourangabazar g.p. under rajnagar r.d. block during the year 2025-26 (ffc fund).
Read moreConstruction and maintenance of road from l066 link road bandi bala takya yousuf shah rd 250 mtrs. to bandibala wahijabad length 1 80 kms stage complete carriageway width 3 75mtrs pmgsy iv batch i 2026 27 package no jk034001 pmgsy division baramull
Construction and maintenance of road from l066 link road bandi bala takya yousuf shah rd 250 mtrs. to bandibala wahijabad length 1 80 kms stage complete carriageway width 3 75mtrs pmgsy iv batch i 2026 27 package no jk034001 pmgsy division baramula
Read moreof your Industry type