Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Making Concrete Columns For Hoist Structure And Dismantling Of Dead Weight Of Defunct Conveyor 1.1 Or 1.2 At Section 3, Jayant Chp
|
| Description |
Making Concrete Columns For Hoist Structure And Dismantling Of Dead Weight Of Defunct Conveyor 1.1 Or 1.2 At Section 3, Jayant Chp
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_305755_1 |
|
Reference Number |
NCL/JNT/EandM/Tender/23-24/918 dtd.19.03.2024 |
| Tender Fee | 0 |
| EMD | 5100 |
| Tender Value | - |
| Place | CHP Jayant Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=316830 |
| Start Date | March 22, 2024 14:30 |
| End Date |
Expired
01/04/2024
Expired 930 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing /overhauling and alignment of 12 nos. eot hoist installed in different conveyors of chp at chp jayant ncl.
Repairing /overhauling and alignment of 12 nos. eot hoist installed in different conveyors of chp at chp jayant ncl.
Read moreDemolishing of existing civil columns near bc#3 conveyor in chp at tnpl unit i
Demolishing of existing civil columns near bc#3 conveyor in chp at tnpl unit i
Read moreRepairing and rewinding of 03 number, 187 kw drive motor for conveyor system of section iii, chp jayant project, ncl.
Repairing and rewinding of 03 number, 187 kw drive motor for conveyor system of section iii, chp jayant project, ncl.
Read moreProviding rrm retaining wall on the toe of south dump along the new chp conveyor in coal section at jayant project
Providing rrm retaining wall on the toe of south dump along the new chp conveyor in coal section at jayant project
Read moreRound the clock shift maintenance of electrical systems installed in chp, shifting mechanical weight, cleaning of cable trench/rack, laying and jointing of power and control cables, lighting points and elect maint hoist and eotofchd-iii btps obra
Round the clock shift maintenance of electrical systems installed in chp, shifting mechanical weight, cleaning of cable trench/rack, laying and jointing of power and control cables, lighting points and elect maint hoist and eotofchd-iii btps obra
Read moreWashable foam pillow of final finished size 45cmsx30cms after filling up the fiber content, 1.0 construction details, 1.1 material for pillow = polyster staple fibre, 1.2 fiber content = 100 percent white virgin hollow fiber, 1.3 weight=400gms, 1.4 pillow should be surrounded by virgin hollow fiber sheet of 20mm thickness(min).1.5 the covering cloth should contain 50 percent (min) polyester yarn and balance cotton. 1.6 pillow should resistant to normal wash. (tag in corner stitched in each pi
For complete deion and other details, please refer to tender
Read moreof your Industry type