Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Round The Clock Shift Maintenance Of Electrical Systems Installed In Chp, Shifting Mechanical Weight, Cleaning Of Cable Trench/Rack, Laying And Jointing Of Power And Control Cables, Lighting Points And Elect Maint Hoist And Eo Tof Chd Iii Btps Obra
|
Description |
Round The Clock Shift Maintenance Of Electrical Systems Installed In Chp, Shifting Mechanical Weight, Cleaning Of Cable Trench/Rack, Laying And Jointing Of Power And Control Cables, Lighting Points And Elect Maint Hoist And Eo Tof Chd Iii Btps Obra
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_RVUNL_871703_1 |
Reference Number |
T-02/CHD-III/OBR-6000004075 |
Tender Fee | 1180 |
EMD | 96000 |
Tender Value | |
Place | office of SE-V BTPS |
Link | https://etender.up.nic.in |
Start Date | December 19, 2023 14:30 |
End Date |
29/01/2024 ( Expired 516 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Round the clock operation, maintenance and overhauling of central ac plants of ucb, 220 kv switchyard control room, package ac plants, air washer systems and maintenance and overhauling of window/split acs, water coolers, ros. all connected piping,
Valves etc. of stage-i and stage-ii, ghtp, lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling under mechanical aux. mtc. cell on lump-sum basis.lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling
Read moreMaintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at forebay including watch and ward of ganvi rest hous
Maintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at forebay including watch and ward of ganvi rest hous
Read moreBiennial contract for round the clock routine, prive and breakdown maintenance of entire electrical systems of main plant and offsite areas bop excluding chp along with engagement of electrical field operation assistance operator shift of 1x660
Biennial contract for round the clock routine, prive and breakdown maintenance of entire electrical systems of main plant and offsite areas bop excluding chp along with engagement of electrical field operation assistance operator shift of 1x660
Read moreRound the clock operation of otis make lift/elevator installed in the service building atps from zero meter to 54 meter levels of the chp, atps anpara and lift operation in general shift, located at service house building of atps,anpara.
Round the clock operation of otis make lift/elevator installed in the service building atps from zero meter to 54 meter levels of the chp, atps anpara and lift operation in general shift, located at service house building of atps,anpara.
Read moreThe work of shift wise routine checking and mechanical maintenance of auxiliaries of coal handling plant and fire quenching in coal yard a/btps, of chp, btps, obra
The work of shift wise routine checking and mechanical maintenance of auxiliaries of coal handling plant and fire quenching in coal yard a/btps, of chp, btps, obra
Read moreThe work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw coal bunkers for smooth coal feeding in rc feeder of unit no. 9, 10, 11, 12and13 of chp, b
The work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw coal bunkers for smooth coal feeding in rc feeder of unit no. 9, 10, 11, 12 and 13 of chp
Read moreMaintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack w.e.f. 01.10.2024 to 31.03.2025 (182days)
Maintaining/observation of water level at forebay of ganvi power house stage-i round the clock and conveying the same to intake and control room of ganvi power house and ganvi power house stage-i w.e.f. 01.10.2024 to 31.03.2025 (182days)
Read moreRound the clock routine, prive and breakdown maintenance of entire electrical and candi systems of main plant and offsite areas (bop) excluding chp along with engagement of electrical field operation assistance (operator shift) of 1x 660mw
Round the clock routine, prive and breakdown maintenance of entire electrical and candi systems of main plant and offsite areas (bop) excluding chp along with engagement of electrical field operation assistance (operator shift) of 1x 660mw
Read moreCleaning of main and sub tranches of conveyor k-10 and k-16 of coal yard of btps, obra and the work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw
Cleaning of main and sub tranches of conveyor k-10 and k-16 of coal yard of btps, obra and the work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw
Read moreMaintaining/observation of water level at forebay of ganvi p h s-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at intake gp h stage-iw.e.f. 07.04.2024 to 30.09.2024 (176 days)
Maintaining/observation of water level at forebay of ganvi p h s-i round the clock and conveying the same to intake and control room of ganvi power house and cleaning of trash rack at intake gp h stage-iw.e.f. 07.04.2024 to 30.09.2024 (176 days)
Read moreof your Industry type