Tender Details

Particulars Details
Title
General Rectification Work Kip Rb Punnala Distributory Rectification Work To Prevent Leakage From Ch.5200m To 5400 M Near Anakkulam In Piravanthoor Panchayath General Civil Work
Description
The Rectification Work Is Proposed For A Length Of 72m.Provisions Made In The Estimate Are Demolishing Existing Damaged Lining, Relining With Rcc For A Thickness Of 0.075m On Both Bed And Sides
Organisation Government of Kerala
Tender Id 2023_Irrig_609615_2
Reference
Number
IRR/PII/TR/742/2023_5_1_1/1
Tender Fee 655
EMD 6115
Tender Value -
Place Thenmala
Link
View Original Tender Notice

https://etenders.kerala.gov.in

Start Date October 17, 2023 15:30
End Date
Expired 26/10/2023

Expired 1050 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
General rectification work kip rbpunnala distributory rectification work to prevent leakage from ch.5200m to 5400 m near anakkulam in piravanthoor panchayath general civil work

The rectification work is proposed for a length of 72m provisions made in the estimate are demolishing existing damaged lining, relining with rcc for a thickness of 0.075m on both bed and sides.

Read more
General-rectification work-kip rbpunnala distributory-rectification work to prevent leakage from ch.5200m to 5400 m near anakkulam in piravanthoor panchayath- general civil work

The rectification work is proposed for a length of 72m.provisions made in the estimate are demolishing existing damaged lining, relining with rcc for a thickness of 0.075m on both bed and sides

Read more
General-kip-kip rb punnala distributory rectification work to pr leakage from ch 4100 m to 4500m vazhangodu bhagam in piravanthoor panchayath general civil work

Clearing grass&amp#x0d demolishing existing damaged canal bed and&amp#x0d sides&amp#x0d earth work excavation and clearing the&amp#x0d accumulated silt and sediments from the bed of&amp#x0d open canal.&amp#x0d cc 13 6, using 20mm, broken stone this&amp#x0d item is proposed for the rectification

Read more
General rectification of kip office building kip om rectification of kip office building in kip

General rectification of kip office building kip om rectification of kip office building in kip &amp#x0d campus near high school junction adoor general civil work

Read more
General kip rb punnala distributory rectification work to pr leakage from chainage 6400 m to 6900 m in piravanthoor panchayath general civil work

Canal lining of the punnala distributory is&amp#x0d severely damaged and this causes heavy seepage&amp#x0d flow and the pore water pressure may damage&amp#x0d the newly formed road at this location

Read more
General-kip(lb)-additional rectification

General-kip(lb)-additional rectification&amp#x0d of paravur distributary relining of canal&amp#x0d between ch7350-7500,9500-10000 and 11500-&amp#x0d 11590m.-general civil work

Read more
General kip rb rectification work of distributaries 2024 kip o ampm rectification work of nediyapadam south distributary between ch 150m and 350m general civil work

General kip rb rectification work of&amp#x0d distributaries 2024 kip o ampm&amp#x0d rectification work of nediyapadam south&amp#x0d distributary between ch 150m and 350m &amp#x0d general civil work

Read more
General kip lb rectification urgent rectification work of cherumanad distributory from ch 2800 to 3000m general civil work

General kip lb rectification urgent rectification work of cherumanad distributory from ch 2800 to 3000m general civil work

Read more
General kip rb rectification work of distributaries 2024 kip o and m urgent rectification of nediyapaadam south distributory at ch 3800 to 3910m general civil work

General kip rb rectification work of&amp#x0d distributaries 2024 kip o and m urgent&amp#x0d rectification of nediyapaadam south&amp#x0d distributory at ch 3800 to 3910m general&amp#x0d civil work

Read more
General kip(rb)punnala distributory rectification work to pr overflow by raising sides of canal from chainage 30 m to 150m in piravanthoor panchayath

During&amp#x0d the water distribution period, a huge quantity of&amp#x0d water overflows through the sides of the canal&amp#x0d between chainages from 30m to 150m. the&amp#x0d water flows nearby houses, toilets, and wells,&amp#x0d affecting proper distribution through the canal.&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise