Tender Details

Particulars Details
Title
General Kip Rb Punnala Distributory Rectification Work To Pr Leakage From Chainage 6400 M To 6900 M In Piravanthoor Panchayath General Civil Work
Description
Canal Lining Of The Punnala Distributory Is&Amp#X0d Severely Damaged And This Causes Heavy Seepage&Amp#X0d Flow And The Pore Water Pressure May Damage&Amp#X0d The Newly Formed Road At This Location
Organisation Irrigation Department | State Govt. and UT
Tender Id 2024_Irrig_690042_1
Reference
Number
IRR/PII/TR/2228/2024_5_1_1/1
Tender Fee 1435
EMD 13771
Tender Value -
Place PIRAVANTHOOR
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1073939

Start Date September 07, 2024 21:30
End Date
Expired 18/09/2024

Expired 721 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
General kip(rb)punnala distributory rectification work to pr overflow by raising sides of canal from chainage 30 m to 150m in piravanthoor panchayath

During&amp#x0d the water distribution period, a huge quantity of&amp#x0d water overflows through the sides of the canal&amp#x0d between chainages from 30m to 150m. the&amp#x0d water flows nearby houses, toilets, and wells,&amp#x0d affecting proper distribution through the canal.&amp#x0d

Read more
General-kip-kip rb punnala distributory rectification work to pr leakage from ch 4100 m to 4500m vazhangodu bhagam in piravanthoor panchayath general civil work

Clearing grass&amp#x0d demolishing existing damaged canal bed and&amp#x0d sides&amp#x0d earth work excavation and clearing the&amp#x0d accumulated silt and sediments from the bed of&amp#x0d open canal.&amp#x0d cc 13 6, using 20mm, broken stone this&amp#x0d item is proposed for the rectification

Read more
Mp lads punnala distributory construction of culvert across punnala distributory at ch 7880m and rectification of punnala distributory between ch 7850m to ch7890m general civil work

Clearing&amp#x0d jungle demolishing cement concrete earthwork&amp#x0d excavation cc 1 4 8 for base of footing rcc&amp#x0d 1 2 4 for footing and abutment rcc 1 1 5 3 for&amp#x0d deck slab bed block and parapet provisions for&amp#x0d centering shuttering and painting

Read more
General-rectification-kip(rb) urgentrectification work of ulavukadu distributory from ch.0 m to ch.100 m and near ch .530 m in palamel panchayath under kip(rb) section40/26 karunagappally.-general civil work

General-rectification-kip(rb) urgentrectification work of ulavukadu&amp#x0d distributory from ch.0 m to ch.100 m and near ch .530 m in palamel panchayath&amp#x0d under kip(rb) section40/26 karunagappally.-general civil work

Read more
General kip rb annual maintenance general kip rb annual maintenance jungle clearance and removal of silt from the canal bed of vallikunnam distributory general civil work general civil work

General kip rb annual maintenance &amp#x0d general kip rb annual maintenance&amp#x0d jungle clearance and removal of silt from&amp#x0d the canal bed of vallikunnam distributory &amp#x0d general civil work general civil work

Read more
General kip rb rectification work of distributaries 2024 kip o and m urgent rectification of nediyapaadam south distributory at ch 3800 to 3910m general civil work

General kip rb rectification work of&amp#x0d distributaries 2024 kip o and m urgent&amp#x0d rectification of nediyapaadam south&amp#x0d distributory at ch 3800 to 3910m general&amp#x0d civil work

Read more
General rectification kip rb rectification work of edappon distributory from ch 3450 m to ch 3800 m in nooranadu panchayath general civil work

General rectification kip rb&amp#x0d rectification work of edappon distributory&amp#x0d from ch 3450 m to ch 3800 m in nooranadu&amp#x0d panchayath general civil work

Read more
Deposit kip rb concreting of moothantevila junction kip canal road kollaka distributory ch 6300m

Deposit kip rb concreting of&amp#x0d moothantevila junction kip canal road-&amp#x0d kollaka distributary ch 6300 in ward 3 of&amp#x0d panmana grama panchayath general civil&amp#x0d work&amp#x0d

Read more
General rectification work kip rbpunnala distributory rectification work to prevent leakage from ch.5200m to 5400 m near anakkulam in piravanthoor panchayath general civil work

The rectification work is proposed for a length of 72m provisions made in the estimate are demolishing existing damaged lining, relining with rcc for a thickness of 0.075m on both bed and sides.

Read more
General-rectification work-kip rbpunnala distributory-rectification work to prevent leakage from ch.5200m to 5400 m near anakkulam in piravanthoor panchayath- general civil work

The rectification work is proposed for a length of 72m.provisions made in the estimate are demolishing existing damaged lining, relining with rcc for a thickness of 0.075m on both bed and sides

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise