Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Rectification Work Kip Rb Punnala Distributory Rectification Work To Prevent Leakage From Ch.5200m To 5400 M Near Anakkulam In Piravanthoor Panchayath General Civil Work
|
| Description |
The Rectification Work
Is Proposed For A Length Of 72m Provisions Made
In The Estimate Are Demolishing Existing
Damaged Lining, Relining With Rcc For A
Thickness Of 0.075m On Both Bed And Sides.
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_609615_1 |
|
Reference Number |
IRR/PII/TR/742/2023_5_1_1/1 |
| Tender Fee | 655 |
| EMD | 6115 |
| Tender Value | - |
| Place | Thenmala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | October 06, 2023 15:30 |
| End Date |
Expired
13/10/2023
Expired 1097 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General rectification work kip rbpunnala distributory rectification work to prevent leakage from ch 5430m to 5800m near anakkulam in piravanthoor panchayathgeneral civil work
Clearing grass demolishing existing damaged canal bed and sides clearing the accumulated silt and sediments from the bed of open canal cc 1 3 6 using 20mm broken stone
Read moreGeneral budget work kip rb punnala distributory rectification work to prevent leakage of canal between ch 6900m to 7110m and ch 7310m to 7600m near poovannamoodu in piravanthoor panchayath general civil work
General budget work kip rb punnala distributory rectification work to prevent leakage of canal between ch 6900m to 7110m and ch 7310m to 7600m near poovannamoodu in piravanthoor panchayath general civil work
Read moreGeneral kip rb urgent rectification of enadimangalam distributory canal between the ch 2500m and ch 4000m general civil work
General kip rb urgent rectification of enadimangalam distributory canal between the ch 2500m and ch 4000m general civil work
Read moreGeneral kip o m section no 7 2 kalanjoor rectification works of konni distributory between ch 1323 m 1560m and between ch 15400 to 17800m general civil work
General kip o m section no 7 2 kalanjoor rectification works of konni distributory between ch 1323 m 1560m and between ch 15400 to 17800m general civil work
Read moreGeneral-rectification work-kip rbpunnala distributory-rectification work to prevent leakage from ch.5200m to 5400 m near anakkulam in piravanthoor panchayath- general civil work
The rectification work is proposed for a length of 72m.provisions made in the estimate are demolishing existing damaged lining, relining with rcc for a thickness of 0.075m on both bed and sides
Read moreGeneral-rectification work-kip rbpunnala distributory-rectification work to prevent leakage from ch.5200m to 5400 m near anakkulam in piravanthoor panchayath- general civil work
The rectification work is proposed for a length of 72m.provisions made in the estimate are demolishing existing damaged lining, relining with rcc for a thickness of 0.075m on both bed and sides
Read moreGeneral-kip-kip rb punnala distributory rectification work to pr leakage from ch 4100 m to 4500m vazhangodu bhagam in piravanthoor panchayath general civil work
Clearing grass&#x0d demolishing existing damaged canal bed and&#x0d sides&#x0d earth work excavation and clearing the&#x0d accumulated silt and sediments from the bed of&#x0d open canal.&#x0d cc 13 6, using 20mm, broken stone this&#x0d item is proposed for the rectification
Read moreGeneral kip rb punnala distributory rectification work to pr leakage from chainage 6400 m to 6900 m in piravanthoor panchayath general civil work
Canal lining of the punnala distributory is&#x0d severely damaged and this causes heavy seepage&#x0d flow and the pore water pressure may damage&#x0d the newly formed road at this location
Read moreGeneral kip(rb)punnala distributory rectification work to pr overflow by raising sides of canal from chainage 30 m to 150m in piravanthoor panchayath
During&#x0d the water distribution period, a huge quantity of&#x0d water overflows through the sides of the canal&#x0d between chainages from 30m to 150m. the&#x0d water flows nearby houses, toilets, and wells,&#x0d affecting proper distribution through the canal.&#x0d
Read moreGeneral kip lb rectification urgent rectification work of cherumanad distributory from ch 2800 to 3000m general civil work
General kip lb rectification urgent rectification work of cherumanad distributory from ch 2800 to 3000m general civil work
Read moreof your Industry type