Removal Of Old/ Damaged Rack Segment (16 Nos.) And Re Fitting Of New Rack Segment In 24/96 Krishna Dragline Working At Nigahi Project.
|
| Description |
Removal Of Old/ Damaged Rack Segment (16 Nos.) And Re Fitting Of New Rack Segment In 24/96 Krishna Dragline Working At Nigahi Project.
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_339298_1 |
|
Reference Number |
NGH/EXCV/TENDERS/25-26/041 |
| Tender Fee | 0 |
| EMD | 28100 |
| Tender Value | - |
| Place | NIGAHI PROJECT |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=351725 |
| Start Date | July 15, 2025 15:00 |
| End Date |
Expired
01/08/2025
Expired 439 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning, repairing and bolt fitting of swing rack gear segment with replacement of broken bolts and fitting and tightening of swing rack gear bolts of 24 96 saurav and gaurav dragline on labour charge basis.
Cleaning, repairing and bolt fitting of swing rack gear segment with replacement of broken bolts and fitting and tightening of swing rack gear bolts of 24 96 saurav and gaurav dragline on labour charge basis.
Read moreAnnual maintenance contract for complete lubrication system of 24 96 saurav and gaurav dragline working at bina project for 365 days
Annual maintenance contract for complete lubrication system of 24 96 saurav and gaurav dragline working at bina project for 365 days
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreRemoval of old/ damaged rack segment (16 nos.) and re-fitting of new rack segment in 24/96 krishna dragline working at nigahi project.
Removal of old/ damaged rack segment (16 nos.) and re-fitting of new rack segment in 24/96 krishna dragline working at nigahi project.
Read moreRepairing of cracks of floor plates of 24/96 krishna dragline working at nigahi project.
Repairing of cracks of floor plates of 24/96 krishna dragline working at nigahi project.
Read moreReplacement of 48 nos. rail segments and live ring assembly (consisting of 20 nos. swing cage assembly) of 24/96 balram dragline and removal of 16 nos. old damaged rack segment and re-fitting of new rack segments in 24/96 balram dragline working at
Replacement of 48 nos. rail segments and live ring assembly (consisting of 20 nos. swing cage assembly) of 24/96 balram dragline and removal of 16 nos. old damaged rack segment and re-fitting of new rack segments in 24/96 balram dragline working at
Read moreAnnual maintenance contract for complete lubrication system of both 24/96 dragline (krishna and balram) working at nigahi project
Annual maintenance contract for complete lubrication system of both 24/96 dragline (krishna and balram) working at nigahi project
Read moreComplete painting work of 24/96 krishna dragline along with denting of structural parts mainly wall, roof of cabin, side wall, roof of machine room of 24/96 krishna dragline working at nigahi project.
Complete painting work of 24/96 krishna dragline along with denting of structural parts mainly wall, roof of cabin, side wall, roof of machine room of 24/96 krishna dragline working at nigahi project.
Read moreRepairing of 04 nos. reversing valve of 24/96 dragline working at nigahi project
Repairing of 04 nos. reversing valve of 24/96 dragline working at nigahi project
Read moreRepairing of 04 nos. reversing valve of 24/96 dragline working at nigahi project
Repairing of 04 nos. reversing valve of 24/96 dragline working at nigahi project
Read moreof your Industry type