Channelization Of River Beas In Fatehpur Constituency In Tehsil Fatehpur And Indora District Kangra Hp
|
Description |
Sub Head Conduction Detailed Survey Work And Providing Compete Hydraulic Data As Desired By Cwprs Pune And Preparation Of Dpr From Rd 0 0 To Rd 32000
|
Organisation | HP Irrigation and Public Health | State Govt. and UT |
Tender Id | 2024_HPIPH_90733_1 |
Reference Number |
EE/JSD/FTR/-2121-2161 dt 19.07.24 |
Tender Fee | 400 |
EMD | 63249 |
Tender Value | |
Place | Fatehpur |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=134235 |
Start Date | July 19, 2024 22:30 |
End Date |
26/07/2024 ( Expired 270 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreTolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreTolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation of wardha (salod hirapur) pulgaon section to 2ps in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation of wardha (salod hirapur) pulgaon section to 2ps in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.