Tender Details

Particulars Details
Title
Lying Of Dry Stone Pitching At Side Slope Of Embankment In Back Side Of Boundary Wall Towards Btl Crusher Under Rocp.
Description
Lying Of Dry Stone Pitching At Side Slope Of Embankment In Back Side Of Boundary Wall Towards Btl Crusher Under Rocp.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_300490_1
Reference
Number
ECL/RJML/GM/AE(C)/23-24/790 Dt-05.02.2024
Tender Fee 0
EMD 14000
Tender Value -
Place Rajmahal OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311260

Start Date February 06, 2024 17:30
End Date
Expired 16/02/2024

Expired 972 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Earthwork for raising back filling of top bund and outer side slope embankment filling of ls settled bank of pc ii from km. 4.48 to km. 5.90.

Earthwork for raising back filling of top bund and outer side slope embankment filling of ls settled bank of pc ii from km. 4.48 to km. 5.90.

Read more
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)

Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Construction of const. of rr masonry side slope wall at interim btl crusher under rocp.

Construction of const. of rr masonry side slope wall at interim btl crusher under rocp.

Read more
Dry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.

Dry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.

Read more
Providing dry stone pitching on embankment in departmental patch for protection of slope of newly constructed embankment at balram ocp under hingula area.

Providing dry stone pitching on embankment in departmental patch for protection of slope of newly constructed embankment at balram ocp under hingula area.

Read more
Providing and laying stone pitching work dump side embankment at lohandia patch side under rocp.

Providing and laying stone pitching work dump side embankment at lohandia patch side under rocp.

Read more
Stone pitching work on river slope

Stone pitching work on river slope

Read more
Providing and laying pcc flooring near interim btl crusher room under rocp.

Providing and laying pcc flooring near interim btl crusher room under rocp.

Read more
Dry stone pitching over embankment of pendari nallah at socp under ib valley area

Dry stone pitching over embankment of pendari nallah at socp under ib valley area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise