Construction Of Const. Of Rr Masonry Side Slope Wall At Interim Btl Crusher Under Rocp.
Description
Construction Of Const. Of Rr Masonry Side Slope Wall At Interim Btl Crusher Under Rocp.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_329385_1
Reference
Number
ECL/RJML/AGM/AE(C)/ e-Ten/24-25/548 Dt-16.02.2025
Tender Fee 0
EMD 20000
Tender Value -
Place Rajmahal OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341400

Start Date February 18, 2025 00:25
End Date
Expired 27/02/2025

Expired 596 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairing/ reclamation and hard facing of worn-out teeth of crusher roll of btl chp.

Repairing/ reclamation and hard facing of worn-out teeth of crusher roll of btl chp.

Read more
Construction of rr masonry/ rcc revetment wall/ hume pipe culvert at various tower 06 no. tower loc. of various 05 no. 220/132 kv ehv lines through work contract under eht-maint., division, itarsi and bina

Construction of rr masonry/ rcc revetment wall/ hume pipe culvert at various tower 06 no. tower loc. of various 05 no. 220/132 kv ehv lines through work contract under eht-maint., division, itarsi and bina

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Providing and laying pcc flooring near interim btl crusher room under rocp.

Providing and laying pcc flooring near interim btl crusher room under rocp.

Read more
Engagement of hydraulic excavator to pick up the band other works at interim and btl crusher at rchp under rocp.

Engagement of hydraulic excavator to pick up the band other works at interim and btl crusher at rchp under rocp.

Read more
Engagement of hydraulic excavator to pick up the band other works at interim and btl crusher at rchp under rocp.

Engagement of hydraulic excavator to pick up the band other works at interim and btl crusher at rchp under rocp.

Read more
Providing and laying pcc pavement near belt line area of interim btl under rocp.

Providing and laying pcc pavement near belt line area of interim btl under rocp.

Read more
Providing and laying pcc flooring near interim crusher pannel room under rocp.

Providing and laying pcc flooring near interim crusher pannel room under rocp.

Read more
Lying of dry stone pitching at side slope of embankment in back side of boundary wall towards btl crusher under rocp.

Lying of dry stone pitching at side slope of embankment in back side of boundary wall towards btl crusher under rocp.