Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dry Stone Pitching Over Embankment Of Pendari Nallah At Socp Under Ib Valley Area
|
| Description |
Dry Stone Pitching Over Embankment Of Pendari Nallah At Socp Under Ib Valley Area
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_MCL_336643_1 |
|
Reference Number |
MCL/GM/IBV/SOC/2025-26/12 dt. 30.05.2025 |
| Tender Fee | 0 |
| EMD | 9200 |
| Tender Value | - |
| Place | SOCP, IB Valley Area, MCL, Brajrajnagar,JharsugudA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348969 |
| Start Date | June 03, 2025 15:30 |
| End Date |
Expired
16/06/2025
Expired 487 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Washing and painting of residential quarters of hilltop and gopi vihar colony at socp, ib valley area
Washing and painting of residential quarters of hilltop and gopi vihar colony at socp, ib valley area
Read moreProviding and laying paverblocks, chainlink fencing, protection wall and other developmental works at effluent treatment plant (etp) of socp under ib valley area
Providing and laying paverblocks, chainlink fencing, protection wall and other developmental works at effluent treatment plant (etp) of socp under ib valley area
Read moreCleaning of sludge from channel mdtp setting tank and repairing of setting tank and channel well and repairing of regulator room of socp of ib valley area
Cleaning of sludge from channel mdtp setting tank and repairing of setting tank and channel well and repairing of regulator room of socp of ib valley area
Read moreRepair to hl bridge over nandhighore goudaput road such as construction of ptotection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to hl bridge over nandhighore goudaput road such as construction of ptotection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreRepair to bridge over river kusumi on saradhapur-bhadikila-ostia road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to bridge over river kusumi on saradhapur-bhadikila-ostia road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreRepair to hl bridge over river kusumi on kadalibandha to gunthasahi road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to hl bridge over river kusumi on kadalibandha to gunthasahi road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreConstruction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreProviding earthen embankment with dry stone pitching at end of sidalu nallah under ashok opencast project, piparwar area.
Providing earthen embankment with dry stone pitching at end of sidalu nallah under ashok opencast project, piparwar area.
Read moreRcc toe wall lining of nallah with stone boulder pitching over side slope for protection from erosion during monsoon at pandren nallah towards north ob face at socp under ib valley area
Rcc toe wall lining of nallah with stone boulder pitching over side slope for protection from erosion during monsoon at pandren nallah towards north ob face at socp under ib valley area
Read moreof your Industry type