Tender Details

Particulars Details
Title
Reconstructing Dry Rubble Stone Pitching At Collecting Drain Left Flank Embankment Of Veer Dam And Allied Works
Description
Reconstructing Dry Rubble Stone Pitching At Collecting Drain Left Flank Embankment Of Veer Dam And Allied Works
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2026_CWRDP_1284892_2
Reference
Number
Notice No. 13 for 2025-2026
Tender Fee 2860
EMD 25500
Tender Value -
Place Veer Dam
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2209768

Start Date March 09, 2026 16:30
End Date
Expired 16/03/2026

Expired 211 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration of sloughed embankment on left side of river jhelum rd 43000m at okhoo by way of rcc cantilever retaining wall and stone pitching.

Restoration of sloughed embankment on left side of river jhelum rd 43000m at okhoo by way of rcc cantilever retaining wall and stone pitching.

Read more
Maintaining, cleaning and upkeep of beds and lawns, toilets and platinum jubilee tower of right flank and governer view point, pavilion, approach roads, toilets at left flank of mettur dam for the period october 2026 to january 2027

Maintaining, cleaning and upkeep of beds and lawns, toilets and platinum jubilee tower of right flank and governer view point, pavilion, approach roads, toilets at left flank of mettur dam for the period october 2026 to january 2027

Read more
Restoration of sloughed/caved embankment on left side of river jhelum rd 51000m at kadlabal bridge by way of stone masonary wall

Restoration of sloughed/caved embankment on left side of river jhelum rd 51000m at kadlabal bridge by way of stone masonary wall

Read more
Maintaining ellis 16 vent surplus arrangements, working platform, 16 vent bridge, vent passeges, piers, flood control room around area at left flank of mettur dam for the period october 2026 to january 2027

Maintaining ellis 16 vent surplus arrangements, working platform, 16 vent bridge, vent passeges, piers, flood control room around area at left flank of mettur dam for the period october 2026 to january 2027

Read more
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)

Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Repair of stone pitching left side of rhr downstream of nangal dam.

Repair of stone pitching left side of rhr downstream of nangal dam.

Read more
Repair of stone pitching left side of rhr downstream at nangal dam.

Repair of stone pitching left side of rhr downstream at nangal dam.

Read more
Providing clay bentonite grouting to the longitudinal cracks on top surface from chainage 1970 to 2110 km of left flank embankment of veer dam and other related works

Providing clay bentonite grouting to the longitudinal cracks on top surface from chainage 1970 to 2110 km of left flank embankment of veer dam and other related works

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise