Tender Details
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission (Jjm) Jjm Phase V Ezhukone Panchayath Pipe Line Extension And House Connection Work In Ward No 1 To 9
|
Description |
Jal Jeevan Mission (Jjm) Jjm Phase V Ezhukone Panchayath Pipe Line Extension And House Connection Work In Ward No 1 To 9&Amp#X0d
&Amp#X0d
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2024_KWA_665061_1 |
Reference Number |
WRD/KWA-CE(SR)/TR/3545/55 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Ezhukone panchayath |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1032474 |
Start Date | February 28, 2024 22:30 |
End Date |
06/03/2024 ( Expired 460 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreSupply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Supply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read more6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreWard no. 02 construction of c.c. road from vishal thakur house in radha nagar to siyaram and from sonu house in sharda nagar to liladhar house
Ward no. 02 construction of c.c. road from vishal thakur house in radha nagar to siyaram and from sonu house in sharda nagar to liladhar house
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreWard no. 27 construction of c.c. road and drain work from ravi katare house to ambaram ji house
Ward no. 27 construction of c.c. road and drain work from ravi katare house to ambaram ji house
Read moreof your Industry type