Tender Details
Particulars | Details |
---|---|
Title |
Comprehensive Maintenance Of Nitrogen Injection Fire Protection System Of 8nos For 33/11 Kv,20 Mva Power Transformer Installed At Power Substation In Mihan Sez, Area, Nagpur
|
Description |
Comprehensive Maintenance Of Nitrogen Injection Fire Protection System Of 8nos For 33/11 Kv,20 Mva Power Transformer Installed At Power Substation In Mihan Sez, Area, Nagpur
|
Organisation | Maharashtra Airport Development Co. Ltd. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 29000 |
Tender Value | |
Place | MIHAN Nagpur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 30, 2025 20:45 |
End Date |
09/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.
Work of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.&#x0d
Read moreProviding and installation of new fire suppression system for 33 kv indoor vcb at 132 kv substation chudiyala.
Providing and installation of new fire suppression system for 33 kv indoor vcb at 132 kv substation chudiyala.
Read moreWork of prive maintenance (amc) of 132/33 kv equipments installed at 132kv substation jwalapur.
Work of prive maintenance (amc) of 132/33 kv equipments installed at 132kv substation jwalapur.
Read morePrive maintenance of compressor and dryer system in coral and dfrp, installation of fire detectors, fdas cabling for dm plant, distilled water plant and filter house, termination and configuration of detector and devices in existing panels
Prive maintenance of compressor and dryer system in coral and dfrp, installation of fire detectors, fdas cabling for dm plant, distilled water plant and filter house, termination and configuration of detector and devices in existing panels
Read moreRepair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at ticca hww and gemini area at dalhousie cantt
Repair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at ticca hww and gemini area at dalhousie cantt
Read moreRepair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at balun mankot vijay vihar and mh area at dalhousie cantt
Repair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at balun mankot vijay vihar and mh area at dalhousie cantt
Read moreOperation and maintenance of 20 kld pre fabricated waste water treatment recycling plant at aob in port area.
Operation and maintenance of 20 kld single composite compact modular type pmtr pre fabricated waste water treatment recycling plant wwtrp for a period of 5 years at aob in port area.
Read moreComprehensive maintenance overhauling along with operation of baggage conveyor system
Comprehensive maintenance, overhauling along with operation of baggage
 conveyor system installed at old domestic terminal building and hajj house for facilitation of
 hajj passengers including amc and calibration of standalone weighing
Read more85932 repair/maintenance of transformer, ht ug cables, god, ht distribution system, poles, protective devices, earthing and other misc work of electric supply in area no. i and ii and other area of age em-i under ge (south) pune
85932 repair/maintenance of transformer, ht ug cables, god, ht distribution system, poles, protective devices, earthing and other misc work of electric supply in area no. i and ii and other area of age em-i under ge (south) pune
Read moreReplacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.
Replacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.
Read moreof your Industry type