Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Surveying Designing Preparation Of Estimate Preparation Of Detailed Project Report And All Related Works Of Kurha Panaache Lift Irrigation Scheme No 1 1820 Ha And Kurha Panaache Lift Irrigation Scheme No 2 1420 Ha Tal Bhusawal
|
Description |
Surveying Designing Preparation Of Estimate Preparation Of Detailed Project Report And All Related Works Of Kurha Panaache Lift Irrigation Scheme No 1 1820 Ha And Kurha Panaache Lift Irrigation Scheme No 2 1420 Ha Tal Bhusawal
|
Organisation | CE Tapi Irrigation Development Corporation Jalgaon | State Govt. and UT |
Tender Id | 2024_TIDC_1007776_1 |
Reference Number |
e- Tender Notice No.2 For 2023-24 |
Tender Fee | 2360 |
EMD | 45500 |
Tender Value | |
Place | Kurha Panache Tal-Bhusawal |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1762477 |
Start Date | February 16, 2024 15:15 |
End Date |
26/02/2024 ( Expired 495 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement of existing 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts with new 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts and their related accessory in cmwssb head office
Replacement of existing 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts with new 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts and their related accessory in cmwssb head office
Read moreInstallation of 1 no. new mini river lift irrigation scheme (solar) at dubduar-ii in raiganj block (sl no-2)
Installation of 1 no. new mini river lift irrigation scheme solar at dubduar-ii in raiganj block under ridf xxix tranche. project id wi252634586s000
Read moreProviding services of manpower to power and colony supply sub-division no 1 alore for six months for following works part a operation and maintenance of e i of residential non residential community centre etc and all work related to energy bill a
Providing services of manpower to power and colony supply sub-division no 1 alore for six months for following works&#x0d part a operation and maintenance of e i of residential non residential community centre etc
Read moreEstimate for repair renovation pump house and staff quarter of gangowal lift irrigation scheme at rd 88731 m of kandi canal stage 2
Estimate for repair renovation pump house and staff quarter of gangowal lift irrigation scheme at rd 88731 m of kandi canal stage 2
Read moreEstimate for providing fixing damage steel wire ropes of ubdc head regulators gate no 1 2 5 6 7 9 12 and fixing er weight of gate no 5 ubdc h r gate no 1 of additional h r at headworks madhopur
Estimate for providing fixing damage steel wire ropes of ubdc head regulators gate no 1 2 5 6 7 9 12 and fixing er weight of gate no 5 ubdc h r gate no 1 of additional h r at headworks madhopurfixing er weight of gate no. 5 ubdc h/r gate n
Read moreDesign supply and installation of 1 no 31 to 45 hp solar submersible pumps with raising main hdpe pipe125mm dai pn16 and pe100 and all allied civil works accessories including testing commissioning and operation and maintenance of the scheme for a p
Design supply and installation of 1 no 31 to 45 hp solar submersible pumps with raising main hdpe pipe125mm dai pn16 and pe100 and all allied civil works accessories including testing commissioning and operation and maintenance of the scheme for a p
Read moreKalsa estimate of providing and installing 1 no. new tubewell in place of failed tubewell at village kalsa distt. kurukshetra. dnit for laying of di rising main for connecting tubewell, construction of approach road and all other works contingent the
Kalsa estimate of providing and installing 1 no. new tubewell in place of failed tubewell at village kalsa distt. kurukshetra. dnit for laying of di rising main for connecting tubewell, construction of approach road and all other works contingent the
Read moreJob no. 65.2025 hewp mtc. of all hort. works of tree plants in green belt pocket no. 1 and 2 sec 25 central verge in sec 33 p-i and sec 14 p ii developed under urban forest at u.e. hisar
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreE- nit no. micd 28 of 2025-26 dated 13-06-2025 repairs to 525 kw liquid resistance er no 1 and 4 of 525 kw ht motor of rafiabad high lift irrigation scheme
Repairs to 525 kw liquid resistance er no 1 and 4 of 525 kw ht motor of rafiabad high lift irrigation scheme
Read moreAmtc water supply scheme dhani haripura group of village bhakra golpura and nangla distt bhiwani providing and installing 1 no tube well near pond in village nangla and all other works contingent there to
Amtc water supply scheme dhani haripura group of village bhakra golpura and nangla distt bhiwani providing and installing 1 no tube well near pond in village nangla and all other works contingent there to
Read moreof your Industry type