Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Surveying Designing And Preparation Of Detailed Project Report Dpr For Barrage On Gomai River Tal Shahada Dist Nandurbar
|
| Description |
Surveying Designing And Preparation Of Detailed Project Report Dpr For Barrage On Gomai River Tal Shahada Dist Nandurbar
|
| Organisation | CE Tapi Irrigation Development Corporation Jalgaon | State Govt. and UT |
| Tender Id | 2024_TIDC_1089857_1 |
|
Reference Number |
E Tender Notice No. 03 Year 2024-25 |
| Tender Fee | 2860 |
| EMD | 62550 |
| Tender Value | - |
| Place | Shahada Taluka |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1901843 |
| Start Date | September 23, 2024 15:30 |
| End Date |
Expired
30/09/2024
Expired 697 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Read moreRe-advertisement for request for proposal for consultancy services for preparation of detailed project report (dpr) and transaction advisor (ta) for buxar – bhagalpur six-lane greenfield access-controlled expressway
Re-advertisement for request for proposal for consultancy services for preparation of detailed project report (dpr) and transaction advisor (ta) for buxar – bhagalpur six-lane greenfield access-controlled expressway
Read moreConsultancy services for detailed survey, investigation, and preparation of the detailed project report (dpr), including architectural and engineering designs, cost estimates, and tender documents for the construction of the silk reeling training centre at santhemarahalli, kollegal taluk, chamarajanagar district.
Consultancy services for detailed survey, investigation, and preparation of the detailed project report (dpr), including architectural and engineering designs, cost estimates, and tender documents for the construction of the silk reeling training centre at santhemarahalli, kollegal taluk, chamarajanagar district.
Read moreEngagement of consultancy services for preparation of detailed project report (dpr) for implementation of model solar village scheme in all the districts of bihar under pradhan mantri-surya ghar: muft bijli yojna.
Engagement of consultancy services for preparation of detailed project report (dpr) for implementation of model solar village scheme in all the districts of bihar under pradhan mantri-surya ghar: muft bijli yojna.
Read moreConsultancy services for preparation of detailed project report, detailed estimates , design and drawings for flood protection works and restoring the original width of hunsikatti halla a major tributary of tupparihalla along the banks of govankoppa, hebballi, kavalageri, kanakoor, talvayi and vanahalli village of dharwad taluk
Consultancy services for preparation of detailed project report, detailed estimates , design and drawings for flood protection works and restoring the original width of hunsikatti halla a major tributary of tupparihalla along the banks of govankoppa, hebballi, kavalageri, kanakoor, talvayi and vanahalli village of dharwad taluk
Read moreCarrying out borehole drilling (boreholes) from km 29 to km 58 (total length 29 km) for conducting surveys and investigations for preparing the design estimates and detailed project report (dpr) for the project to supply krishna river water to drough
Carrying out borehole drilling (boreholes) from km 29 to km 58 (total length 29 km) for conducting surveys and investigations for preparing the design estimates and detailed project report (dpr) for the project to supply krishna river water to drough
Read morePreparation of detailed project report (dpr)
Preparation of detailed project report (dpr) for introducing mass rapid transit system
 between poonamalle and parandur as part of chennai metro rail limited network
Read moreConsultancy services for preparation of detailed project report (dpr)
Consultancy services for preparation of detailed project report &#x0d (dpr)
Read morePreparation of detailed project report dpr of upgradation and
Preparation of detailed project report (dpr) of upgradation and&#x0d modernization of state level water testing and monitoring laboratory (slwqtml), uttarakhand jal&#x0d sansthan, dehradun
Read morePreparation of detailed project report (dpr) for metro rail
Preparation of detailed project report (dpr) for metro rail&#x0d connectivity on two corridors in gurguram
Read moreof your Industry type