Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Raising Of Nh 15 From Ch 402.400 Km (Bhajugaon) To Ch 403.900 Km (Jiadhal) (Total Length 1.500 Km) Along With Providing With 3(three) Nos Of Box Culvert In The State Of Assam Under Annual Plan 2023 24. (Epc Job No. 15/As/2023/24/249)
|
| Description |
Raising Of Nh 15 From Ch 402.400 Km (Bhajugaon) To Ch 403.900 Km (Jiadhal) (Total Length 1.500 Km) Along With Providing With 3(three) Nos Of Box Culvert In The State Of Assam Under Annual Plan 2023 24. (Epc Job No. 15/As/2023/24/249)
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_796512_1 |
|
Reference Number |
No.NHR.49/2023/6 |
| Tender Fee | 10000 |
| EMD | 10.39 Lakh |
| Tender Value | - |
| Place | Dibrugarh |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=837254 |
| Start Date | February 20, 2024 21:30 |
| End Date |
Expired
21/03/2024
Expired 939 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of 4-lane flyover along with approaches and service roads at simrahi bazar from design ch. 170.210 km to ch. 172.250 km on nh27 (total length 2.04 km.) in the state of bihar on epc mode.
Construction of 4-lane flyover along with approaches and service roads at simrahi bazar from design ch. 170.210 km to ch. 172.250 km on nh27 (total length 2.04 km.) in the state of bihar on epc mode.
Read moreEngineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2
Engineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2
Read moreEngineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, station & other buildings, platform work, lc work and other miscellaneous works for 25t indian railway standard loading from kundawa chainpur (excl.) to raxaul (excl.) (i.e. ch. 145.500 to 186.540) (total 41.04 km) in connection with doubling of sitamarhi-raxaul section in samastipur division of east central railway
Engineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, station & other buildings, platform work, lc work and other miscellaneous works for 25t indian railway standard loading from kundawa chainpur (excl.) to raxaul (excl.) (i.e. ch. 145.500 to 186.540) (total 41.04 km) in connection with doubling of sitamarhi-raxaul section in samastipur division of east central railway
Read moreEngineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of ea
Engineering, procurement and construction (epc) tender for construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of ea
Read moreEngineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project
Engineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project
Read moreRaising of nh-15 from ch 402.400 km (bhajugaon) to ch 403.900 km (jiadhal) (total length 1.500 km) along with providing with 3(three) nos of box culvert in the state of assam under annual plan 2023-24. (epc job no. 15/as/2023/24/249)
Raising of nh-15 from ch 402.400 km (bhajugaon) to ch 403.900 km (jiadhal) (total length 1.500 km)
 along with providing with 3(three) nos of box culvert in the state of assam under annual plan 2023-24. (epc
 job no. 15/as/2023/24/249)
Read moreStrengthening and raising the existing bund in the south side of primary pond from ch 1470 m to ch 1555 m and ch 1685 m to ch 1765 m for a total length of 165 m in ash dyke area
Strengthening and raising the existing bund in the south side of primary pond from ch 1470 m to ch 1555 m and ch 1685 m to ch 1765 m for a total length of 165 m in ash dyke area
Read moreRehabilitation upgradation to 2lps for gandhigram realignment with major bridge from ch. 24.250 to ch. 27.200 (total length 2.95 km) on nh161a (akola akot section) in the state of maharashtra on epc mode.
Rehabilitation upgradation to 2lps for gandhigram realignment with major bridge from ch. 24.250 to ch. 27.200 (total length 2.95 km) on nh161a (akola akot section) in the state of maharashtra on epc mode.
Read moreRehabilitation upgradation to 2lps for gandhigram realignment with major bridge from ch. 24.250 to ch. 27.200 (total length 2.95 km) on nh-161a (akola-akot section) in the state of maharashtra on epc mode.
Rehabilitation upgradation to 2lps for gandhigram realignment with major bridge from ch. 24.250 to ch. 27.200 (total length 2.95 km) on nh-161a (akola-akot section) in the state of maharashtra on epc mode.
Read moreof your Industry type