Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Wbpwd/Ae/Rgkhsd/N Ie T 01/25 26
|
Description |
Construction Of Shed For Cisf Personal In Front Of Main Gates Near To Emergency Building And Pod Building In The Campuses Of Rg Kar Medical College And Hospital.
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_848396_1 |
Reference Number |
WBPWD/AE/RGKHSD/NIeT-01/25-26 |
Tender Fee | 0 |
EMD | 4383 |
Tender Value | |
Place | R G kar Hospital |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1894619 |
Start Date | May 19, 2025 23:30 |
End Date |
30/05/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreConstruction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Construction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction of additional 3rd 4th and 5th floors to the centre of excellence for pediatric institute of child health and research centre building in government rajaji hospital at madurai
Construction of additional 3rd 4th and 5th floors to the centre of excellence for pediatric institute of child health and research centre building in government rajaji hospital at madurai
Read moreof your Industry type