Upgradation The Road From Moolakkadu Road To Meenpalam Road In Varatharajapuram Panchayat. (Km 0/000 2/100) In Thuraiyur Block In Tiruchirappalli District.
|
Description |
Upgradation The Road From Moolakkadu Road To Meenpalam Road In Varatharajapuram Panchayat. (Km 0/000 2/100) In Thuraiyur Block In Tiruchirappalli District.
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 88000 |
EMD | 88000 |
Tender Value | |
Place | Block development office Thuraiyur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 23, 2025 14:40 |
End Date |
29/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreUpgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConsultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border