Tender Details
Particulars | Details |
---|---|
Title |
Stable Bleaching Powder (V2) For Household And Industrial Use Conforming To Is 1065 (Part 1)
|
Description |
|
Organisation | Urban Development and Housing Department Jharkhand | |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 22:27 |
End Date |
03/06/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreAnnual maintenance contract for boiler and its auxiliary system including arc job of unit-1 to unit-3 of bktpp for two years
Annual maintenance contract for boiler and its auxiliary system including arc job of&#x0d unit-1 to unit-3 of bktpp for two years
Read moreCarrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Carrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Read moreFlood protection work scheme part 02 for gabbar singh vc army camp located on the right bank of the kho river in kotdwar area dugadda development block district pauri garhwal
Flood protection work scheme part 02 for gabbar singh vc army camp located on the right bank of the kho river in kotdwar area dugadda development block district pauri garhwal&#x0d reach 0 to 125 m us from existing rw and 0 to 50 m ds from rw
Read moreof your Industry type