Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cement Concrete Road (Jilha Warshik Yojna)
|
| Description |
Construction Of Cement Concrete Road (Jilha Warshik Yojna)
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_YAVAT_922389_1 |
|
Reference Number |
nit 08 2022 23 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Secretary / Sarpanch Gram Panchayat |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | July 05, 2023 19:30 |
| End Date |
Expired
10/07/2023
Expired 1114 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreDevelopment of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of cement concrete road (jilha warshik yojna yojna )
Construction of cement concrete road (jilha warshik yojna yojna )
Read moreConstruction of cement concrete road (jilha warshik yojna yojna )
Construction of cement concrete road (jilha warshik yojna yojna )
Read moreConstruction of cement concrete road (jilha warshik yojna )
Construction of cement concrete road (jilha warshik yojna )
Read moreConstruction of cement concrete road (jilha warshik yojna)
Construction of cement concrete road (jilha warshik yojna)
Read moreof your Industry type