Tender Details

Particulars Details
Title
Handling Work At Paddy Purchase Center Kanth Mandi 2
Description
Handling Work At Paddy Purchase Center Kanth Mandi 2
Organisation Government of Uttar Pradesh
Tender Id 2023_DOFCS_819919_1
Reference
Number
467
Tender Fee 295
EMD 2000
Tender Value -
Place RFC OFFICE CIVIL LINES MORADABAD
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date July 12, 2023 21:30
End Date
Expired 22/07/2023

Expired 1159 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Hiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years

Hiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years

Read more
Construction of conference hall at vikarabad of vikarabad district(balance work)

Construction of conference hall at vikarabad of vikarabad district(balance work)

Read more
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district

Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district

Read more
Repair and painting work of exterior walls and internal corridors of all hostel buildings at aiims patna

Repair and painting work of exterior walls and internal corridors of all hostel buildings at aiims patna

Read more
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Read more
Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis

Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis

Read more
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Procurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.

Procurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.

Read more
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise