Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Water Supply Scheme Talwandi Sabo Wtp I And Wtp Ii And Laying Of Pipe Line In Dashmesh Nagar Bathinda Road Block Talwandi Sabo District Bathinda
|
Description |
Improvement Of Water Supply Scheme Talwandi Sabo Wtp I And Wtp Ii And Laying Of Pipe Line In Dashmesh Nagar Bathinda Road Block Talwandi Sabo District Bathinda
|
Organisation | Water Supply and sanitation | State Govt. and UT |
Tender Id | 2025_WSS_135072_1 |
Reference Number |
580/14-02-2025 |
Tender Fee | 6900 |
EMD | 1.73 Lakh |
Tender Value | |
Place | works |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=272995 |
Start Date | February 17, 2025 23:00 |
End Date |
03/03/2025 ( Expired 97 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreImprovements of existing water supply scheme in maraimalai nagar municipality
Improvements of existing water supply scheme in maraimalai nagar municipality
Read moreRepair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja
Repair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja
Read moreRepair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreProviding and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Providing and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type