Tender Details

Particulars Details
Title
Providing And Laying Of Gi Pipe Line From Ring Well To Assam Type Qtrs. And Camp Office (Extraction) At Kalsi Including Construction Of Water Storage Tank (Sump) 30,000 Ltrs. Capacity Under Bakultala Range During 2024 25
Description
Providing And Laying Of Gi Pipe Line From Ring Well To Assam Type Qtrs. And Camp Office (Extraction) At Kalsi Including Construction Of Water Storage Tank (Sump) 30,000 Ltrs. Capacity Under Bakultala Range During 2024 25
Organisation Department of Environment and Forests | State Govt. and UT
Tender Id 2024_DFOMA_15113_1
Reference
Number
MA/2(S)/92/23
Tender Fee 0
EMD 20031
Tender Value
Place Kalsi
Link https://eprocure.andaman.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=15966
Start Date August 07, 2024 19:00
End Date

16/08/2024 ( Expired 268 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repair maintenance of gi ppr pipe line valves and water storage tank other connected works at 190 mtn bde 725 ad pl 190 mbsc 108 engr regt b det 106 fd wksp 305 fd hosp 15 mli 935 ifsu 23 jak 4 bihar 2 3 cisu

Repair maintenance of gi ppr pipe line valves and water storage tank other connected works at 190 mtn bde 725 ad pl 190 mbsc 108 engr regt b det 106 fd wksp 305 fd hosp 15 mli 935 ifsu 23 jak 4 bihar 2 3 cisu apjd zong and&#x0d 312 fd regt under ge 859

Read more
Construction of bore well with water tank (60,000 ltrs) storage capacity including construction of boundary wall with gates, parking space, common toilet and bathroom, drainage system, rain water harvesting structure (mplads)

Construction of bore well with water tank (60,000 ltrs) storage capacity including construction of boundary wall with gates, parking space, common toilet and bathroom, drainage system, rain water harvesting structure (mplads)

Read more
Replacement of few damaged external gi water supply line for type iv/1 to type iv/5 and replacement of damaged pvc storage tank for l/9 at permanent campus, nehu, shillong. (old pipes to be transferred to plumbing section).

Replacement of few damaged external gi water supply line for type iv/1 to type iv/5 and replacement of damaged pvc storage tank for l/9 at permanent campus, nehu, shillong. (old pipes to be transferred to plumbing section).

Read more
Repair maint of external water supply system replacement of old us ci gi pipe line sluice valve gate valve cleaning of ug sump and service tank and misc allied works at zone a and b area at kalimpong and sherwani mil stn under ge 867 ews

Repair maint of external water supply system replacement of old us ci gi pipe line sluice valve gate valve cleaning of ug sump and service tank and misc allied works at zone a and b area at kalimpong and sherwani mil stn under ge 867 ews

Read more
Di water supply pipe line from 5b bore well to cone sump at kothagudem area

Supplying, laying and jointing of 250mm dia. di water supply pipe line from 5b bore well (near jungle) to cone sump at kothagudem area, bhadradri kothagudem district, telangana state.

Read more
Constructing rcc under ground tank of 6 lakh ltr capacity constructing pump chamber, constructing boundary wall, providing and installation machineries and electrical equipments and laying cutting, jointing of d.i k-7 water supply pipe line of 250 mm

Constructing rcc under ground tank of 6 lakh ltr capacity constructing pump chamber, constructing boundary wall, providing and installation machineries and electrical equipments and laying cutting, jointing of d.i k-7 water supply pipe line of 250 mm

Read more
Operation and maintenance of d.i. pipe line, over head tank, sump well, storm water line, street light at industrial park ratlam distt. ratlam for a period of 24 months

Operation and maintenance of d.i. pipe line, over head tank, sump well, storm water line, street light at industrial park ratlam distt. ratlam for a period of 24 months

Read more
Raising height of barvi dam rehabilitation work replacement of 10 hp and 20 hp pump with ers and laying of 80 mm dia gi pipe from well to newly installed water tank at mohghar ii gaothan.

Raising height of barvi dam rehabilitation work replacement of 10 hp and 20 hp pump with ers and laying of 80 mm dia gi pipe from well to newly installed water tank at mohghar ii gaothan.

Read more
Const. of 15-meter height elevated steel staging and installation of 20,000 litre water storage cap. pvc tank with gi pipe and fitting at 3rd bench of office cum residential complex, sawalkote he project, tanger, dist.-ramban, jk

Const. of 15-meter height elevated steel staging and installation of 20,000 litre water storage cap. pvc tank with gi pipe and fitting at 3rd bench of office cum residential complex, sawalkote he project, tanger, dist.-ramban, jk

Read more
Replacement of damaged rcc overhead tank with polyethylene water storage tank and old damaged gi pipe line with cpvc water supply line for all b type quarters of pragati nagar colony of dipka area

Replacement of damaged rcc overhead tank with polyethylene water storage tank and old damaged gi pipe line with cpvc water supply line for all b type quarters of pragati nagar colony of dipka area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise