Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Sci Sabarmati Crane Upgradation 15 T 10 M To 15 T 15 M
|
Description |
Sci Sabarmati Crane Upgradation 15 T 10 M To 15 T 15 M
|
Organisation | Shipping Corporation of India Ltd | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Mumbai |
Link |
AAAAAAAAAA Login to view |
Start Date | May 26, 2025 16:40 |
End Date |
18/07/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pole contactor required to overhauling of 25 ton eot crane of 415v, 32 amp, coil voltage 110 of siemens, abb or bch make.
For complete deion and other details, please refer to tender
Read moreRefurbishment upgradation development operation and maintenance of the existing hospital at voc port tuticorin to a 100 bedded super speciality hospital on dbfot basis through ppp
Refurbishment upgradation development operation and maintenance of the existing hospital at voc port tuticorin to a 100 bedded super speciality hospital on dbfot basis through ppp
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48
Consultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48 junction-sukesh-nanapondha-kaprada section of nh-848 in the state of gujarat
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder of porbandar- kalavad section of nh-151k
Consultancy services of independent engineer for upgradation to two lane with paved shoulder of porbandar-bhanvad-jamjodhpur-kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat
Read moreConsultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat
Consultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreof your Industry type