Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Erection Of A 6.6k V Overhead Line From The Transportable Sub Station Site To The Main Sump Pump House Site For The Establishing Power Supply For Electric Pumps For Dewatering At Tetariakhar Ocp Under Rajhara Area
|
Description |
Erection Of A 6.6k V Overhead Line From The Transportable Sub Station Site To The Main Sump Pump House Site For The Establishing Power Supply For Electric Pumps For Dewatering At Tetariakhar Ocp Under Rajhara Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_337264_1 |
Reference Number |
GM(RA)/CHANDWA/EnM/25-26/07 Dated 10.06.2025 |
Tender Fee | 0 |
EMD | 20200 |
Tender Value | |
Place | Tetariakhar OCP Balumath |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349625 |
Start Date | June 10, 2025 23:30 |
End Date |
23/06/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu
Read moreComplete repairing of 3.3kv/400amps gec make ht ocb switch for controlling 3.3kv overhead line block-iv ocp at sub-station kali mandir of abgc under govindpur area-iii si.no 5513
Complete repairing of 3.3kv/400amps gec make ht ocb switch for controlling 3.3kv overhead line block-iv ocp at sub-station kali mandir of abgc under govindpur area-iii si.no 5513
Read moreErection and di of 11kv overhead feeding power to gidi-c and religara from gidi washery substation coming under gidi-a mining area and 3.3kv overhaed line feeding power to dewatering pump at gidi-a quarry respectively and shifting of 01 no fix
Erection and di of 11kv overhead feeding power to gidi-c and religara from gidi washery substation coming under gidi-a mining area and 3.3kv overhaed line feeding power to dewatering pump at gidi-a quarry respectively and shifting of tower
Read more1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
Read moreShifting, erection and dismantling of ht overhead line feeder f2, f5, f7 at central pump house coal section to provide power to pumps operation during monsoon period
Shifting, erection and dismantling of ht overhead line feeder f2, f5, f7 at central pump house coal section to provide power to pumps operation during monsoon period
Read moreDismantling and new erection 440v o/h line near 5 pit sub-station for lighting supply to akashkinaree basti, chhahtabad, kaju bagan, kailudih and nearby basti(b) repairing of pole mounted cable of o/h line f-22 , 6.6kv dismantling of 185sqmm cable ne
Dismantling and new erection 440v o/h line near 5 pit sub-station for lighting supply to akashkinaree basti, chhahtabad, kaju bagan, kailudih and nearby basti(b) repairing of pole mounted cable of o/h line f-22 , 6.6kv dismantling of 185sqmm cable ne
Read moreDismantling and erection of section of 440v, 3 phase 4 wire overhead distribution line for power supply to new crusher at slg siding under govindpur area
Dismantling and erection of section of 440v, 3 phase 4 wire overhead distribution line for power supply to new crusher at slg siding under govindpur area
Read moreStrengthening of water supply( erection of 03 no. new tubewell for water supply network sector-75 ) (construction of pump house, p/l tube wells rising main line, erection of pumping plant for tubewells, electrification of tws)
Strengthening of water supply( erection of 03 no. new tubewell for water supply network sector-75 ) (construction of pump house, p/l tube wells rising main line, erection of pumping plant for tubewells, electrification of tws)
Read moreErection of new ht feeders 6.6kv and 3.3kv oh/l from.kantapahri sub-station to pumping station meant for dewatering of sump at kantapahari patch of akwmc ocp katras area.
Erection of new ht feeders 6.6kv and 3.3kv oh/l from.kantapahri sub-station to pumping station meant for dewatering of sump at kantapahari patch of akwmc ocp katras area.
Read moreErection of a 6.6kv overhead line from the transportable sub-station site to the main sump pump house site for the establishing power supply for electric pumps for dewatering at tetariakhar ocp under rajhara area
Erection of a 6.6kv overhead line from the transportable sub-station site to the main sump pump house site for the establishing power supply for electric pumps for dewatering at tetariakhar ocp under rajhara area
Read moreof your Industry type