Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🌧️ Monsoon Preparation Works At Tetariakhar Ocp, Rajhara Area 🌧️ Central Coalfields Limited (Cccl), A Public Sector Undertaking, Is Seeking Bids For The Execution Of Critical Monsoon Preparation Works, Which Include The Cutting Of Catch Drains With Sump Arrangements Around The Overburden (Ob) Dump At Tetariakhar Open Cast Project (Ocp), Rajhara Area. 📅 Bid Submission Deadline: June 03, 2024, 6:00 Pm The Tender Fee Is Inr 10,000, With No Emd Required. Interested Contractors Must Possess The Necessary Expertise And Equipment To Undertake This Project, Which Is Essential For Monsoon Preparedness. Detailed Proposals, Including Method Statements, Safety Plans, And Cost Estimates, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Catch Drain, Sump Arrangement, Monsoon Preparation, Central Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission, Rajhara Area, Tetariakhar Ocp| Particulars | Details |
|---|---|
| Title |
Cutting Of Catch Drain With Sump Arrangement Around Ob Dump Under Monsson Preparation Works At Tetariakhar Ocp, Rajhara Area
|
| Description |
Cutting Of Catch Drain With Sump Arrangement Around Ob Dump Under Monsson Preparation Works At Tetariakhar Ocp, Rajhara Area
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_308709_1 |
|
Reference Number |
SO(C)/RA/e-tender/04/24-25/60 |
| Tender Fee | 0 |
| EMD | 10000 |
| Tender Value | - |
| Place | OFFICE OF THE GENRAL MANAGER RAJHARA AREA CHANDWA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319887 |
| Start Date | May 23, 2024 14:30 |
| End Date |
Expired
03/06/2024
Expired 862 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of view point shed at ttk ocp under rajhara area at tetariakhar ocp under rajhara area.
Repair of view point shed at ttk ocp under rajhara area at tetariakhar ocp under rajhara area.
Read moreProviding lan/internet connectivity to continuous ambient air quality monitoring system stations (caaqms) at tetariakhar ocp and at rocp, rajhara area, by extension of existing lan network using ofc and media converters
Providing lan/internet connectivity to continuous ambient air quality monitoring system stations (caaqms) at tetariakhar ocp and at rocp, rajhara area, by extension of existing lan network using ofc and media converters
Read moreConstruction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreProviding empty cement bags, filling of ob in cement bags, stitching and stacking the same at view point for preparation of sump, pumping station, laying of pipe line and different kind of work in monsoon period at rajnagar ocm
Providing empty cement bags, filling of ob in cement bags, stitching and stacking the same at view point for preparation of sump, pumping station, laying of pipe line and different kind of work in monsoon period at rajnagar ocm
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreCutting of catch drain with sump arrangement around ob dump under monsson preparation works at tetariakhar ocp, rajhara area.
Cutting of catch drain with sump arrangement around ob dump under monsson preparation works at tetariakhar ocp, rajhara area.
Read moreCutting of catch drain with sump arrangement for monsson preparation works at rajhara ocp, rajhara area.
Cutting of catch drain with sump arrangement for monsson preparation works at rajhara ocp, rajhara area.
Read moreConstruction of toe wall along ob dump of tetariakhar ocp, rajhara area
Construction of toe wall along ob dump of tetariakhar ocp, rajhara area
Read moreConstruction of toe wall along ob dump of tetariakhar ocp, rajhara area
Construction of toe wall along ob dump of tetariakhar ocp, rajhara area
Read morePlantation of 550 numbers of trees between toe of ob dump, tetariakhar ocp, rajhara area
Plantation of 550 numbers of trees between toe of ob dump, tetariakhar ocp, rajhara area
Read moreof your Industry type