Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
(1)construction Of Ei Gate Goomty In Connection With Con From Mlb To Elb Of Engineering Gate No.Pk 3 In Between Prr Gtd Section &Amp Am 7 In Between Snkr Rui Section (2) Construction Of Ei Gate Goomty In Connection With Interlocking Of Engineering Gate No.Mr 32 In Between Pnw Rdf Section &Amp (3) Construction Of 5 (Five) Bedded Rest Room With Lavatory For Lady Rpf Train Escorting Staff At Bokaro Rly. Station In Adra Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79286163 |
|
Reference Number |
E-DRM-Engg-ADRA-03-25 |
| Tender Fee | 0 |
| EMD | 2.42 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79286163/viewNitPdf_4819739.pdf |
| Start Date | January 10, 2025 00:21 |
| End Date |
Expired
03/02/2025
Expired 618 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1) construction of ei gate goomty in connection with interlocking to upgrade non-interlocked lc gate ka-63 in between bishnupur-ondagram 2) construction of ei gate goomty in connection with con from mlb to elb gate no. ka-102 between bankura-chhatna in adra division.3)construction of ei gate goomty in connection with interlocking of gate no. br-47 between sonamokhi-dhansimla in adra division
For complete deion and other details, please refer to tender
Read more(1)construction of ei gate goomty in connection with con from mlb to elb gates for 3 nos. of engineering gates ( am-7, pk-3 & bg-5) in adra division (2) construction of ei gate goomty in connection with interlocking to upgrade of non-interlocked gate no.mr-32 in between pnw-rdf section & am-38 in between vaa-lyd section & (3) construction of 5 (five) bedded rest room with lavatory for lady rpf train escorting staff at bokaro rly. station in adra division.
For complete deion and other details, please refer to tender
Read more(1) construction of ei gate goomty in connection with con from mlb to elb of engineering gate no. bg-5 in between bje-sbw section (2) construction of ei gate goomty in connection with interlocking of level crossing no.am-38 in between vaa-lyd section in adra division of s.e.railway.
For complete deion and other details, please refer to tender
Read more(1) construction of ei gate goomty in connection with con from mlb to elb gates for 4 nos. of engineering gates (ka-142, ka-160, ka-147 and ra-8) (2) provision of new elb with gate goomty at 3 nos. of lc gates (ka-157, jc-14 and jc-40) to replace the gate lodge from existing old cabin lever frame in adra division of s.e. railway (3) construction of ei gate goomty in connection with interlocking to upgrade of non-interlocked lc gate no.dk-6 in between moh-kpk & jc-24 in between tao-
For complete deion and other details, please refer to tender
Read moreIndoor/outdoor signalling & telecom work in connection with i) cable clearance to facilitate engineering work of rob & rub in lieu of railway crossing gate lc 321 (at km 634/25-27 at sakti yard) and lc 361 (at km 706/21-23 between jrmg-gtw),ii) alteration/modification in the existing ei for elimination of lc 354 (at km 694/21-23 between jrmg-akt at latia yard) and lc 321 (at sakti yard) and iii) alteration in signalling goomty and data logger to eliminate gate of lc-355 (at km 695/5-7
For complete deion and other details, please refer to tender
Read moreElectrical work for:-(a) at ttb, fkg-improvement of water supply arrangement for staff amenities.(b) at tsk division- provision of double storey gate goomty at l- xing no- st/88, st/89, st/90, st/92 and st/95 in elephant corridoors between ttb- nch section and provision of rubberized road surface at lc gate no.st 86, st 116, st 136 & st 138 of tsk division.
For complete deion and other details, please refer to tender
Read more(i) balance work of fob at girwar, isharwara, sumreri, cop work at pathariya, ganeshganj and sumreri and circulating area at pathariya (ii) repairs of different service buildings in between malkhedi to pathariya (iii) improvement to ganeshganj station yard. (iv) sp & ssp in between baghora to pathariya (v) balance work of construction of station building, ibh building, end goomty, gate lodge, sp, ssp, quarter, road work, hs tank, underground water storage tank, pressure filter shifting a
For complete deion and other details, please refer to tender
Read moreTrenching, supply & laying of cables, foundation/erection/wiring of location boxes, signal post, erection & wiring of relay racks, installation, wiring & testing of ips, lc gate, supply, installation, wiring & testing of msdac/ssdac and supply/ installation/ testing/ commissioning of new distributed electronic interlocking at wadsa station(centre ei building & one end goomty) & centralized electronic interlocking at armori, kondhala & gadchiroli station of na
For complete deion and other details, please refer to tender
Read moreof your Industry type