| Particulars | Details |
|---|---|
| Title |
Tn 5498 Work Of Insitu Retubing Of Tube Nest Of Main Ejector Of 110 Mw Unit 1 And Retubing Of Tube Nest Of Lph 3/4/5 And Lube Oil Cooler Of Bfp 110 Mw Units Of Kstps, Kota
|
| Description |
Work Of Insitu Retubing Of Tube Nest Of Main Ejector Of 110 Mw Unit 1 And Retubing Of Tube Nest Of Lph 3/4/5 And Lube Oil Cooler Of Bfp 110 Mw Units Of Kstps, Kota
|
| Organisation | RRVUN - CMD | State Govt. and UT |
| Tender Id | 2025_RRVUN_522719_1 |
|
Reference Number |
TN-5498 |
| Tender Fee | 1090 |
| EMD | 6480 |
| Tender Value | - |
| Place | Kota Super Thermal Power Station |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=932477 |
| Start Date | December 29, 2025 17:30 |
| End Date |
Expired
22/01/2026
Expired 225 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of tube nest assembly of turbine oil cooler of 3x210 mw, kwu unit
Supply of tube nest assembly of turbine oil cooler of 3x210 &#x0d mw, kwu unit
Read moreTn-5424 repair of cracks in lp casing of 110 mw unit# 1, kstps, kota by metal stitching technique.
Repair of cracks in lp casing of 110 mw unit 1, kstps, kota by metal stitching technique.
Read moreTn-5369 complete re-tubing of turbine lube oil cooler of 110mw unit including repair of main tube plates, baffle plates and tie rods etc and bfp oil coolers of 210 mw unit 5, kstps, kota
Complete re-tubing of turbine lube oil cooler of 110mw unit including repair of main tube plates, baffle plates and tie rods etc and bfp oil coolers of 210 mw unit 5, kstps, kota
Read moreTn-16076 supply of bfp recirculation control valve with actuator, cep recirculation control valve with actuator (for 110 mw unit 1 and 2) and hph-5 to deaerator normal drain valve with actuator in turbine area of kstps, kota.
Supply of bfp recirculation control valve with actuator, cep recirculation control valve with actuator (for 110 mw unit 1 and 2) and hph-5 to deaerator normal drain valve with actuator in turbine area of kstps, kota.
Read moreMtps i tm unit iv renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc 1 ejector 4a vent condenser gasket renewing of feed water tank
Mtps i tm unit iv renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc 1 ejector 4a vent condenser gasket renewing of feed water tank
Read moreMtps i tm unit iii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc 1 ejector 3b and renewal of gasket at deaerator main flange
Mtps i tm unit iii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc 1 ejector 3b and renewal of gasket at deaerator main flange
Read moreMtps i tm unit i renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc1 ejector 3b and renewal of gasket at deaerator main flange deaerator
Mtps i tm unit i renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc1 ejector 3b and renewal of gasket at deaerator main flange deaerator
Read moreMtps i tm unit iv renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc 1 ejector 4b and renewal of gasket at deaerator main flange
Mtps i tm unit iv renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 3 4 gc 1 ejector 4b and renewal of gasket at deaerator main flange
Read moreof your Industry type