Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps 1 Bm Units I And Ii Retubing Of Lub Oil Cooler Nest For Air Pre Heaters With 90 10 Cupro Nickel Tubes Including The Cost Of Materials
|
| Description |
Mtps 1 Bm Units I And Ii Retubing Of Lub Oil Cooler Nest For Air Pre Heaters With 90 10 Cupro Nickel Tubes Including The Cost Of Materials
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_404212_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM / OT.353/ 2023-24 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | Office of the Superintending Engineer /M-I/MTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | December 28, 2023 22:30 |
| End Date |
Expired
18/01/2024
Expired 1000 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in water wall area s panel area water wall reducer tubes inter pass area etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in water wall area s panel area water wall reducer tubes inter pass area etc
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreRe tubing of lp heater tube nest by 90/10 cupro nickel tubes 1 no
Re tubing of lp heater tube nest by 90/10 cupro nickel tubes 1 no
Read moreRe-tubing of 1 no vent condenser tube nest of 210 mw lmw design turbine by 90-_10 cupro nickel tubes as per the material specification_1 no
Re-tubing of 1 no vent condenser tube nest of 210 mw lmw design turbine by 90-_10 cupro nickel tubes as per the material specification_1 no
Read moreRe_ tubing of low pressure heater _lph 4_ tube nest of unit i and iv of 210 mw lmw design turbine by 90/10 cupro nickel tubes _ 2 nos
Re_ tubing of low pressure heater _lph 4_ tube nest of unit i and iv of 210 mw lmw design turbine by 90/10 cupro nickel tubes _ 2 nos
Read moreRe_tubing of 1 no vent condenser tube nest of 210 mw lmw design turbine by 90_10 cupro nickel tubes as per the material specification
Re_tubing of 1 no vent condenser tube nest of 210 mw lmw design turbine by 90_10 cupro nickel tubes as per the material specification
Read moreof your Industry type