Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hot Air Gun
|
| Description |
|
| Organisation | NA | Ministry of Railways |
| Tender Id | GEM/2023/B/3617319 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 28, 2023 21:28 |
| End Date |
Expired
11/07/2023
Expired 1188 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NAGINA INDUSTRIAL CORPORATION
8176
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AVI ROOT INFO SOLUTIONS PRIVATE LIMITED | Make : STANLEY Model : STXH2000 | 29-06-2023 16:29:54 | N/A | Qualified |
| 2 | NAGINA INDUSTRIAL CORPORATION | Make : STANLEY Model : STXH2000 | 01-07-2023 18:50:39 | N/A | Qualified |
| 3 | PIONEER TRADING COMPANY | Make : MAKITA Model : Makita - HG6530 | 10-07-2023 23:42:26 | N/A | Qualified |
| 4 | SANJAY STEEL FABRICATION WORKS | Make : SSFW Model : SSFW-HAG-12 L | 04-07-2023 10:15:10 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | NAGINA INDUSTRIAL CORPORATION | Item Categories : Hot air gun | 8176.00 | L1 |
| 2 | AVI ROOT INFO SOLUTIONS PRIVATE LIMITED | Item Categories : Hot air gun | 8200.00 | L2 |
| 3 | SANJAY STEEL FABRICATION WORKS | Item Categories : Hot air gun | 25724.00 | L3 |
| 4 | PIONEER TRADING COMPANY | Item Categories : Hot air gun | 34680.00 | L4 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| STANLEY Coiled Wire Hot Air Gun | STANLEY | STXH2000 | 4 | ₹ 8176.000 |
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Read moreProcurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Read moreConstruction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type