Tender Details
Particulars | Details |
---|---|
Title |
O.R On Kalka Shimla Wangtoo Road Nh 05 167.00 To 236.000 Sh Providing Wmm In The Required Reaches Between Km 174.040 To 176.440
|
Description |
O.R On Kalka Shimla Wangtoo Road Nh 05 167.00 To 236.000 Sh Providing Wmm In The Required Reaches Between Km 174.040 To 176.440
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_103649_1 |
Reference Number |
PW.NH.CB.E.Tender.24-23-32 dt 4.4.2025 |
Tender Fee | 2000 |
EMD | 82000 |
Tender Value | |
Place | NH Theog. |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=152116 |
Start Date | April 09, 2025 22:30 |
End Date |
19/04/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConstruction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read morePls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Read moreConstr/impvt of road birdhwal-puggal-bajju between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc
Constr/impvt of road b-p-b between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc mode
Read moreof your Industry type