Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rcc Compound Wall Of 2.5 Meter Height With Y Type Barbed Wire Fencing Sn 44 At Riverside Of Dapivali Village In Badlapur Forest Range
|
Description |
Construction Of Rcc Compound Wall Of 2.5 Meter Height With Y Type Barbed Wire Fencing Sn 44 At Riverside Of Dapivali Village In Badlapur Forest Range
|
Organisation | Head Of Forest Force Nagpur Maharashtra State | State Govt. and UT |
Tender Id | 2025_HFFN_1158878_1 |
Reference Number |
TFD_44_2024_25 |
Tender Fee | 1090 |
EMD | 49000 |
Tender Value | |
Place | Dapivali |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2015511 |
Start Date | March 10, 2025 23:30 |
End Date |
17/03/2025 ( Expired 54 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreConstruction of rcc compound wall for shrisketra matruling ganapati devasthan at siddhapur tal. mangalwedha. b) construction of internal concrete road for shrisketra matruling ganapati devasthan at siddhapur tal. man
Construction of rcc compound wall for shrisketra matruling ganapati devasthan at siddhapur tal. mangalwedha.&#x0d b) construction of internal concrete road for shrisketra matruling ganapati devasthan at siddhapur tal. man
Read moreConstruction work of barbed wire fencing towards the land of parks and forest department and internal work of water supply and water connection in the area of kisan plot in sector-19c of vrindavan yojna no.4, lucknow
Construction work of barbed wire fencing towards the land of parks and forest department and internal work of water supply and water connection in the area of kisan plot in sector-19c of vrindavan yojna no.4, lucknow
Read moreRepair / maint to boundary wall, plaster, concertina coil, barbed wire, grating alongwith bdy wall at stn parade ground and 250 transit camp and repair / maint to hard standing, paved area, compound wall incl chain link fencing in chinar complex and
Repair / maint to boundary wall, plaster, concertina coil, barbed wire, grating alongwith bdy wall at stn parade ground and 250 transit camp and repair / maint to hard standing, paved area, compound wall incl chain link fencing in chinar complex and
Read moreRepair and replacement of rcc jali, fencing, ms and ss gates, drains, foot path and compound wall etc in mohan nagar at chandipur under age b and r-i at chandipur
Repair and replacement of rcc jali, fencing, ms and ss gates, drains, foot path and compound wall etc in mohan nagar at chandipur under age b and r-i at chandipur
Read moreMisc repair works to rcc cover slab, storm water drain hard standing parking tiles rcc jali, fencing barbed wire concertina coil and compound wall etc in tech area under age b and r -i chandipur
Misc repair works to rcc cover slab, storm water drain hard standing parking tiles rcc jali, fencing barbed wire concertina coil and compound wall etc in tech area under age b and r -i chandipur
Read moreBeautification of pandey pond/barricating with fencing wire and r.c.c. column in word-01 azad nagar
Beautification of pandey pond/barricating with fencing wire and r.c.c. column in word-01 azad nagar at nagar panchayat sikandra, kanpur dehat &#x0d
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of high security jail complex at narela, delhi (sh- construction of ward block, control room and dispensary, langar with mess staff, administration block, 3 nos. r.c.c. boundary wall, 8 nos watch towers, 8 nos rcc and steel entry gate
Construction of high security jail complex at narela, delhi (sh- construction of ward block, control room and dispensary, langar with mess staff, administration block, 3 nos. r.c.c. boundary wall, 8 nos watch towers, 8 nos rcc and steel entry gate
Read moreHorticultural development, construction of compound wall, library, footpath on outside and other necessary civil work in nearest garden and green belt at sampat hills colony situated bypass in ward no. 76 zone no. 19 under (mahapur nidhi)
Horticultural development, construction of compound wall, library, footpath on outside and other necessary civil work in nearest garden and green belt at sampat hills colony situated bypass in ward no. 76 zone no. 19 under (mahapur nidhi)
Read moreof your Industry type