Tender Details
Particulars | Details |
---|---|
Title |
Wbpw(r)d/Nit 13 Of Se/Whc I/2023 2024/2
|
Description |
Link Road From Pandua Kalna Rd To Terrabank School Via Hazli To Patharghata Rd From 0 To 8.24 Km, Surfacing And Allied Works (Except Existing Mastic Portion) Of Kalna Hway Sub Divn Under Burdwan South Hway Divn, In The District Of Purba Bardhaman.
|
Organisation | Government of West Bengal |
Tender Id | 2023_SH_549473_2 |
Reference Number |
WBPW(R)D/NIT- 13 of SE/WHC-I/2023-2024 |
Tender Fee | |
EMD | 2.45 Lakh |
Tender Value | |
Place | Off of the S.E./W.H.C.1/P.W.(R)D. |
Link | https://wbtenders.gov.in |
Start Date | August 02, 2023 20:30 |
End Date |
22/08/2023 ( Expired 638 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)
Repair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)
Read moreTiruppur corporation_retro fitting of existing water supply pipe line from avinashi to mettupalayam road (from 0/0 13/0 km) due to four laning works by highways department, avinashi sub division under coimbatore division.
Retro fitting of existing water supply pipe line from avinashi to mettupalayam road (from 0/0 13/0 km) due to four laning works by highways department, avinashi sub division under coimbatore division.
Read moreAAAAAAAAAA
Login to viewKalna baidyapur road from 0.00 kmp to 13.63 km- strengthening work under burdwan south highway division, p.w.(roads) dte in the district of purba bardhaman.
Read moreExtension of pipe line in/c other allied works from dtw chulaibari to luku holy cross high school under laxmicherra vc bokafa rd block within the jurisdiction of dws sub-division santirbazar during the year 2025-26.
Extension of pipe line in/c other allied works from dtw chulaibari to luku holy cross high school under laxmicherra vc bokafa rd block within the jurisdiction of dws sub-division santirbazar during the year 2025-26.
Read moreWidening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Widening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Read moreMtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)
Mtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)
Read moreMtc of rd from kls rangauti rd to ibb rd via devipur school l 1.63 km portion from 1.00 km to 1.63 km sh patch metalling, grouting, re-carpeting , seal coating, rsd etcetc complete during the yr 2025 26.
Mtc of rd from kls rangauti rd to ibb rd via devipur school l 1.63 km portion from 1.00 km to 1.63 km sh patch metalling, grouting, re-carpeting , seal coating, rsd etcetc complete during the yr 2025 26.
Read moreSub-work:-hiring of private vehicle for the purpose of inspection of the works in (rb) sub-division, chandragiri for the year 2024-25 from 01.08.2024 to 31.03.2025 under the main work of improvements of riding surface of piler-bhakarapeta road via yellamanda km.16/0 to 37/0 in tirupati district(3rd call)
Sub-work:-hiring of private vehicle for the purpose of inspection of the works in (rb) sub-division, chandragiri for the year 2024-25 from 01.08.2024 to 31.03.2025 under the main work of improvements of riding surface of piler-bhakarapeta road via yellamanda km.16/0 to 37/0 in tirupati district(3rd call)
Read moreLink road from bhawai to jiyad via jogi bag (gp bhawai) km. 0/00 to 13/00 (sh c/o 900 mm dia hume pipe culvert at rd. 0/075 and 3/260) under scsp
Link road from bhawai to jiyad via jogi bag (gp bhawai) km. 0/00 to 13/00 (sh c/o 900 mm dia hume pipe culvert at rd. 0/075 and 3/260) under scsp
Read moreFdr to road from bishalgarh_golaghati road to deer park via itbhatta, chandranagar, muslimpara and baidhyadighi hs school during the year 2025_26_sh_carpeting in patches and sand seal coat portion from ch 0 point 00 km to ch 5 point 00 km
Fdr to road from bishalgarh_golaghati road to deer park via itbhatta, chandranagar, muslimpara and baidhyadighi hs school during the year 2025_26_sh_carpeting in patches and sand seal coat portion from ch 0 point 00 km to ch 5 point 00 km
Read moreof your Industry type