Tender Details
Particulars | Details |
---|---|
Title |
Re Conditioning Of 3.3 Kv O/H Electric Line Feeding Power To Pump Motor Installed At Cre With Installation Of Goab Switch Of Konar Exp. Ocp,Bn K Area.
|
Description |
Re Conditioning Of 3.3 Kv O/H Electric Line Feeding Power To Pump Motor Installed At Cre With Installation Of Goab Switch Of Konar Exp. Ocp,Bn K Area.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_289000_7 |
Reference Number |
PE(EnM)/AKK OCP/e-tender/23-24/24 |
Tender Fee | |
EMD | 2400 |
Tender Value | |
Place | OFFICE of PE EnM AKK OCP |
Link | https://coalindiatenders.nic.in |
Start Date | September 16, 2023 23:30 |
End Date |
22/09/2023 ( Expired 600 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 750kva, 3.3kv/440v trans-switch unit with fabrication of shed and foundation at elecon and ir feeder breaker under kdh project, nk area
Installation of 750kva, 3.3kv/440v trans-switch unit with fabrication of shed and foundation at elecon and ir feeder breaker under kdh project, nk area
Read moreRe organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecl
Re organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecltr
Read moreRepairing /replacement of digital make power supply card ,cpu card, display card with junction box for electronic road wb1 and wb3 and supply and installation of gi conduit wiring from load cell to junction box in all wbs installed under akk ocp,bnk
Repairing /replacement of digital make power supply card ,cpu card, display card with junction box for electronic road wb1 and wb3 and supply and installation of gi conduit wiring from load cell to junction box in all wbs installed under akk ocp,bnk
Read moreDrilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1
Drilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1
Read moreRepairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Repairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Read morePower re-organization with bunch cable, installation of mccb and repair and maintenance of 02 nos. fog cannon along with control panel at kuju new siding of topa project under kuju area.
Power re-organization with bunch cable, installation of mccb and repair and maintenance of 02 nos. fog cannon along with control panel at kuju new siding of topa project under kuju area.
Read moreDesign, supply, installation, testing and commissioning of grid connected ground mounted solar power plant of 25 mw (ac) with 40 percentage dc overload capacity at rampur colliery and samaleswari ocp, mcl and comprehensive o and m for ten years.
Design, supply, installation, testing and commissioning of grid connected ground mounted solar power plant of 25 mw (ac) with 40 percentage dc overload capacity at rampur colliery and samaleswari ocp, mcl and comprehensive o and m for ten years.
Read more6.6kv o/h line work at different locations of basundhara(w)ocp, mahalaxmi area
6.6kv o/h line work at different locations of basundhara(w)ocp, mahalaxmi area
Read moreErection of 6.6kv overhead line 2440 mtr for power supply of 6.6kv from 33kv substation rbocp to mines for ht pump installation and for the ht feeder required for silo at rampur batura ocp of sohagpur area secl
Erection of 6.6kv overhead line 2440 mtr for power supply of 6.6kv from 33kv substation rbocp to mines for ht pump installation and for the ht feeder required for silo at rampur batura ocp of sohagpur area secl
Read moreInstallation of solar based water pump with over head tank at masjid near h/o rafikul islam part 13-13 dhanirampur i 98336094
Installation of solar based water pump with over head tank at masjid near h/o rafikul islam part 13-13 dhanirampur i 98336094
Read moreof your Industry type