Tender Details

Particulars Details
Title
Fabrication Of 5 Nos Of Movable Gi Sheds For Electrical Switchgears Installed At Pumping Station Of Mines Wrt Konar Exp. Ocp, Bn K Area
Description
Fabrication Of 5 Nos Of Movable Gi Sheds For Electrical Switchgears Installed At Pumping Station Of Mines Wrt Konar Exp. Ocp, Bn K Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_338352_1
Reference
Number
PE(EnM)/AKK OCP/e-tender/25-26/20
Tender Fee 0
EMD 5000
Tender Value
Place AKKOCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350742
Start Date June 26, 2025 14:30
End Date

05/07/2025 ( Expired 13 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Survey design fabrication supply installation testing commissioning and operation and maintenance for a period of 5 years of total 110 nos of all in one off grid solar street light at various location of srpf group no 1 ramtekdi pune in maharashtra

Survey design fabrication supply installation testing commissioning and operation and maintenance for a period of 5 years of total 110 nos of all in one off grid solar street light at various location of srpf group no 1 ramtekdi pune in maharashtra

Read more
(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more 3000 gpm pump set flow m

(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more 3000 gpm pump set flow m

Read more
Providing shed for arrangement of systematic electrical equipment surface at sub station of nowrozabad west mine under nowrozabad sub area of johilla area.

Providing shed for arrangement of systematic electrical equipment surface at sub station of nowrozabad west mine under nowrozabad sub area of johilla area.

Read more
Handling of 20 kg c.i test weight for quarterly testing of road weighbridge no. 02 and no. 03 and maintenance of earth pits installed at road weighbridge and rail weighbridge installed under kdh ocp, nk area

Handling of 20 kg c.i test weight for quarterly testing of road weighbridge no. 02 and no. 03 and maintenance of earth pits installed at road weighbridge and rail weighbridge installed under kdh ocp, nk area

Read more
Providing protection wall at the upstream and downstream end of hume pipe installed beneath the ob ramp road for proper drainage of mine water at dharam patch of chhal ocp mine of chhal sub-area (second call)

Providing protection wall at the upstream and downstream end of hume pipe installed beneath the ob ramp road for proper drainage of mine water at dharam patch of chhal ocp mine of chhal sub-area(second call)

Read more
Comprehensive annual maintenance contract of five nos numeric make 5 kva online ups for a period of one year installed at cm office deputy cm office conference hall iii 3rd floor and vc room ii 2nd floor of the new secretariat building capital compl

Comprehensive annual maintenance contract of five nos numeric make 5 kva online ups for a period of one year installed at cm office deputy cm office conference hall iii 3rd floor and vc room ii 2nd floor of the new secretariat building capital compl

Read more
Tender for 120kw power enhancement for ev station with 250kva transformer work at 5 ros in eo-1 area (mr2 and mr4) of mysore territory.

Tender for 120kw power enhancement for ev station with 250kva transformer work at 5 ros in eo-1 area (mr2 and mr4) of mysore territory.

Read more
Minor repairing of 08 nos. transformers 3.3kv/440v installed at colony substations for providing power supply in colony area at bina project

Minor repairing of 08 nos. transformers 3.3kv/440v installed at colony substations for providing power&#x0d supply in colony area at bina project

Read more
Primary side incoming power control arrangement for all the distribution transformers installed at mines of jagannath ocp, ja

Primary side incoming power control arrangement for all the distribution transformers installed at mines of jagannath ocp, ja

Read more
Operation, watch and ward of 1no 3.75 mld stp, 1 no sewage pumping station and 5 nos tube wells pumping plant along with all connected electrical and mechanical equipment

Operation, watch and ward of 1no 3.75 mld stp, 1 no sewage pumping station and 5 nos tube wells pumping plant along with all connected electrical and mechanical equipment .

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise