Tender Details

Particulars Details
Title
General Wp Cada (2024 2025) Modernization Of Field Channal Offtakes Fromthe Ch 0 330 Km (Lhs) Of Koundan Canal In Between Ch 0 250 Km To 0 750 Km
Description
General Wp Cada (2024 2025) Modernization Of Field Channal Offtakes Fromthe Ch 0 330 Km (Lhs) Of Koundan Canal In Between Ch 0 250 Km To 0 750 Km
Organisation Irrigation Department | State Govt. and UT
Tender Id 2025_Irrig_755767_1
Reference
Number
IRR/PI/TR/1486/2024_5_1_1/1 C11
Tender Fee 2760
EMD 42355
Tender Value
Place Pudussery Panchayath
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1227306
Start Date March 28, 2025 15:30
End Date

05/04/2025 ( Expired 15 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply and stacking of dry coarse sand between km 0 pt 00 and km

Supply and stacking of dry coarse sand between km 0 pt 00 and km &#x0d 4 pt 939 on kyangnosla menla road for provision of safety aspects to achieve high visibility high traffic under 129 rcc 758 brtf project swastik in sikkim state job no 304 264&#x0d

Read more
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra

Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra

Read more
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore - villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu

Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu

Read more
Annual maintenance of zero bridge to koteshwar road in between ch 0.00 to 17.00 km at khep, koteshwar

Annual maintenance of zero bridge to koteshwar road in between ch 0.00 to 17.00 km at khep, koteshwar

Read more
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district

Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district

Read more
Scheme for modernization and restoration of chandeli minor in tehsil khatima of district udham singh nagar under nabard. (reach between km 0.385 to 2.500 km)

Scheme for modernization and restoration of chandeli minor in tehsil khatima of district udham singh nagar under nabard. (reach between km 0.385 to 2.500 km)

Read more
Irrigation precautionary measure for goaltore branch canal(glt.b.c.) from ch.52.00 to ch.483.00 in connection with kharif irrigation 2025 (1st, 2nd and 3rd watering) under goaltore section of k.c sub-division no.-i, salboni, paschim medinipur.

Irrigation precautionary measure for goaltore branch canal(glt.b.c.) from ch.52.00 to ch.483.00 in connection with kharif irrigation 2025 (1st, 2nd and 3rd watering) under goaltore section of k.c sub-division no.-i, salboni, paschim medinipur.

Read more
Consultancy services for preparation of dpr for widening and upgradation of ambedkar nagar to raebareli section of nh 128 from dc km 0.00 to km 148.980 and ayodhya prayagraj section from ch. km 82.000 to km 95.100 of nh 330 in uttar pradesh

Consultancy services for preparation of dpr for widening and upgradation of ambedkar nagar to raebareli section of nh 128 from dc km 0.00 to km 148.980 and ayodhya prayagraj section from ch. km 82.000 to km 95.100 of nh 330 in uttar pradesh

Read more
Fifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.31.900 km to 32.021 km and ch.32.080 km to 32.430 km in mapusa city of bardez taluka (re-tender).

Fifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.31.900 km to 32.021 km and ch.32.080 km to 32.430 km in mapusa city of bardez taluka (re-tender).

Read more
Fifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.32.760 km to 33.445 km in mapusa city of bardez taluka (re-tender).

Fifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.32.760 km to 33.445 km in mapusa city of bardez taluka (re-tender).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise