Particulars | Details |
---|---|
Title |
General Wp Cada 2024 2025 Modernization Of Field Channal Offtakes From The Ch 05 750 Km Rhs Of No 3 Distributory Canal In Between Ch 0 000 Km To 0 100 Km 1426 2024 General Civil Work
|
Description |
General Wp Cada 2024 2025 Modernization Of Field Channal Offtakes From The Ch 05 750 Km Rhs Of No 3 Distributory Canal In Between Ch 0 000 Km To 0 100 Km 1426 2024 General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_732239_1 |
Reference Number |
IRR/PI/TR/1426/2024_5_1_1/1 |
Tender Fee | 795 |
EMD | 8992 |
Tender Value | |
Place | Walayar |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1169545 |
Start Date | January 30, 2025 22:30 |
End Date |
06/02/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
Read moreGeneral-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km
General-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km
Read moreGeneral-emergency-mp- rbc-urgent removal of rock by blasting and stacking stone to the edges at rbc main canal ch 6/200 km and removing top slabs and cleaning of cut cover at ch 6/100 km -general civil work
Big rock was fallen from the right side bund&#x0d of rbc main canal at ch 6/200 km. since the&#x0d region was high cutting area, rock was only&#x0d found during canal cleaning process.as the&#x0d rock was huge and it will cause obstruction for&#x0d water distributi
Read moreGeneral wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
General wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
Read moreGeneral budget work 2024 25 20precentage overlay with bc 1.100 km improvements to bsnl road in varkala town roads using bc overlay and allied works from ch 0 000 to 1 100-general civil work
General budget work 2024 25 20precentage overlay with bc 1.100 km improvements to bsnl road in varkala town roads using bc overlay and allied works from ch 0 000 to 1 100-general civil work
Read moreGeneral wp cada 2024 2025 modernization of field channel offtakes from ch 02 500 km of chalai lbc canal in between ch 0 000km to 0 350 km 1408 2024 general civil work
General wp cada 2024 2025 modernization of field channel offtakes from ch 02 500 km of chalai lbc canal in between ch 0 000km to 0 350 km 1408 2024 general civil work
Read moreGeneral 3818 2024 wp 2024 2025 rectification works to chullimada canal from ch 1 580km to 1 745km general civil work
General 3818 2024 wp 2024 2025 rectification works to chullimada canal from ch 1 580km to 1 745km general civil work
Read moreDeposit-kyip 2023-24-construction of mampoyil ulliyeri south canal road in ulliyeri grama panchayath(canal inspection road between ch. 2/108 km and ch. 2/235 km of narath distributory)-general civil work
Deposit-kyip 2023-24-construction of&#x0d mampoyil ulliyeri south canal road in ulliyeri&#x0d grama panchayath(canal inspection road&#x0d between ch. 2/108 km and ch. 2/235 km of&#x0d narath distributory)-general civil work
Read moreGeneral irr pii kkty 2024 25 urgent rectification work to the karukutty karayamparambu branch canal between ch 5 112 km to 5 140 km and raising of mambra branch canal sides between ch 0 010km to 0 060 km general civil work
Emergency rectification workof canal
Read moreDeposit-deposit works-kyip 2024-25 construction of canal bund road between ch 0/300 km and 0/400 km of pallikkara field bothie canal (pallikkara central l.p canal mukku-vattakuni thazha road ) in tikkodi grama panchayath-phase 1-general civil work
Kyip 2024-25 construction of canal bund road between ch 0/300 km and 0/400 km of pallikkara field bothie canal (pallikkara central l.p canal mukku-vattakuni thazha road ) in tikkodi grama panchayath-phase 1-general civil work