Tender Details
Particulars | Details |
---|---|
Title |
General Wp Cada 2024 2025 Modernization Of Field Channal Offtakes From The Ch 05 750 Km Rhs Of No 3 Distributory Canal In Between Ch 0 000 Km To 0 100 Km 1426 2024 General Civil Work
|
Description |
General Wp Cada 2024 2025 Modernization Of Field Channal Offtakes From The Ch 05 750 Km Rhs Of No 3 Distributory Canal In Between Ch 0 000 Km To 0 100 Km 1426 2024 General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_732239_1 |
Reference Number |
IRR/PI/TR/1426/2024_5_1_1/1 |
Tender Fee | 795 |
EMD | 8992 |
Tender Value | |
Place | Walayar |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1169545 |
Start Date | January 30, 2025 22:30 |
End Date |
06/02/2025 ( Expired 97 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Genera -rp 2024 2025 improvements by providing bm and bc to muttikulangara kamba kinavallur road km 3/200 to 5/365 and km 0/000 to 2/550 in kongad lac palakkad district general civil work
General rp 2024 2025 improvements by providing bm and bc to muttikulangara kamba kinavallur road km 3/200 to 5/365 and km 0/000 to 2/550 in kongad lac palakkad district general civil work
Read moreMirpa- mankery-improvements to the main canal of li scheme mankery from ch 0-600m to 0-850 m in irimbiliyam panchayath kottakkal lac- malappuram district-general civil work -retender 1
Mirpa- mankery-improvements to the main canal of li scheme mankery from ch 0-600m to 0-850 m in irimbiliyam panchayath kottakkal lac- malappuram district-general civil work -retender 1
Read moreImprovement to road from batagaon to medical square (from ch. 0/500 km to 1/200 km, 1/750 km to 2/00 km, and 2/800 km to 3/200 km) for ensuing car-festival 2025 (such as providing wearing coat with sdbc)
Improvement to road from batagaon to medical square (from ch. 0/500 km to 1/200 km, 1/750 km to 2/00 km, and 2/800 km to 3/200 km) for ensuing car-festival 2025 (such as providing wearing coat with sdbc)
Read morePothundy project - 2024 - 25 - rectification works between ch . 3/100 km and 3/ 160km of kairady branch canal
The work is proposed for the urgent&#x0d rectification of kairady branch canal
Read moreGeneral sr 2024 25 construction of drainage and footpath to perambra- thanikkandy - chakkittapara road from ch.0 000 to 0 500 general civil work
General sr 2024 25 construction of drainage and footpath to perambra- thanikkandy - chakkittapara road from ch.0 000 to 0 500 general civil work
Read moreGeneral wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
Read moreGeneral-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km
General-wp- cada (2024-2025) modernization of field channal offtakes fromthe ch 0-330 km (lhs) of koundan canal in between ch 0-250 km to 0-750 km
Read moreLac-ads-lac - ads works-construction of box culvert at nettissery branch canal ch. 0/300 km-general civil work
Lac-ads-lac - ads works-construction of&#x0d box culvert at nettissery branch canal ch.&#x0d 0/300 km-general civil work
Read moreGeneral-emergency-mp- rbc-urgent removal of rock by blasting and stacking stone to the edges at rbc main canal ch 6/200 km and removing top slabs and cleaning of cut cover at ch 6/100 km -general civil work
Big rock was fallen from the right side bund&#x0d of rbc main canal at ch 6/200 km. since the&#x0d region was high cutting area, rock was only&#x0d found during canal cleaning process.as the&#x0d rock was huge and it will cause obstruction for&#x0d water distributi
Read moreGeneral wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
General wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
Read moreof your Industry type