Tender Details

Particulars Details
Title
Interlinking Muppathadam Sreeshakthi 11 Kv Ug Cable 1.2 Km Under Electrical Section Edayar
Description
Interlinking Muppathadam Sreeshakthi 11 Kv Ug Cable 1.2 Km Pottanagar Tfr To Panayikulam Valavu Under Electrical Section Edayar By Hdd Method
Organisation Kerala State Electricity Board | State Govt. and UT
Tender Id 2025_KSEB_746992_1
Reference
Number
42/EE/PMU-PBVR/2024-25/ALV
Tender Fee 5900
EMD 50000
Tender Value
Place Edayar
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1207183
Start Date March 12, 2025 16:30
End Date

19/03/2025 ( Expired 33 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana

Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Cs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh

Cs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Read more
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Read more
Special repair to replacement of lt oh conductor to ug cable with all accessories at dhar road under ge a dhar road udhampur job no z sre-11 2024-25

Special repair to replacement of lt oh conductor to ug cable with all accessories at dhar road under ge a dhar road udhampur job no z sre-11 2024-25

Read more
Repair replacement maint of lt panels ug cable network, street lights lt switch gears incl allied work at ad regt engr regt and bana singh line at sector a under ge u ambala cantt

Repair replacement maint of lt panels ug cable network, street lights lt switch gears incl allied work at ad regt engr regt and bana singh line at sector a under ge u ambala cantt

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise