Tender Details
Particulars | Details |
---|---|
Title |
Interlinking Muppathadam Sreeshakthi 11 Kv Ug Cable 1.2 Km Under Electrical Section Edayar
|
Description |
Interlinking Muppathadam Sreeshakthi 11 Kv Ug Cable 1.2 Km Pottanagar Tfr To Panayikulam Valavu Under Electrical Section Edayar By Hdd Method
|
Organisation | Kerala State Electricity Board | State Govt. and UT |
Tender Id | 2025_KSEB_746992_1 |
Reference Number |
42/EE/PMU-PBVR/2024-25/ALV |
Tender Fee | 5900 |
EMD | 50000 |
Tender Value | |
Place | Edayar |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1207183 |
Start Date | March 12, 2025 16:30 |
End Date |
19/03/2025 ( Expired 33 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreCs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh
Cs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreSpecial repair to replacement of lt oh conductor to ug cable with all accessories at dhar road under ge a dhar road udhampur job no z sre-11 2024-25
Special repair to replacement of lt oh conductor to ug cable with all accessories at dhar road under ge a dhar road udhampur job no z sre-11 2024-25
Read moreRepair replacement maint of lt panels ug cable network, street lights lt switch gears incl allied work at ad regt engr regt and bana singh line at sector a under ge u ambala cantt
Repair replacement maint of lt panels ug cable network, street lights lt switch gears incl allied work at ad regt engr regt and bana singh line at sector a under ge u ambala cantt
Read moreof your Industry type