Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Water Drains Andchannelization Work At Various Location Of South Campus (Sh Construction Of Rcc Water Drains At Various Location Of South Campus Andchannelization Of Nallah To Provide Cross Drainage With Gabion Wallsand Gabion Cascade
|
Description |
Construction Of Water Drains Andchannelization Work At Various Location Of South Campus (Sh Construction Of Rcc Water Drains At Various Location Of South Campus Andchannelization Of Nallah To Provide Cross Drainage With Gabion Wallsand Gabion Cascade
|
Organisation | Indian Institute of Technology Mandi | Central Govt. Ministry/Department |
Tender Id | 2024_IITMD_816049_1 |
Reference Number |
IIT Mandi (CW)/SE-1625/2024-25/872-74 Dated 11-07-2024 |
Tender Fee | 1800 |
EMD | 9.55 Lakh |
Tender Value | |
Place | South campus of IIT Mandi |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=857601 |
Start Date | July 12, 2024 00:00 |
End Date |
12/08/2024 ( Expired 301 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction work of new chambers on drains at various places under ward number 31
Construction work of new chambers on drains at various places under ward number 31
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at jagatdihi zone-26 kulti under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at jagatdihi zone-26 kulti under amrut 2.0 phase-iii&#x0d within amc
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of new triple storied ground floor first floor part of second floor school building at baijalbari h. s. school khowai district tripura. sh building portion including internal water supply sanitary installation sewage and drainage wo
Construction of new triple storied ground floor first floor part of second floor school building at baijalbari h. s. school khowai district tripura. sh building portion including internal water supply sanitary installation sewage and drainage wo
Read moreCarrying out fabrication and installation of ms grills in 300 bed hostel stair case windows and paver block works in hockey change room and covering the rcc drain covers to the storm water chambers in the campus at sai,nssc,bangalore
Carrying out fabrication and installation of ms grills in 300 bed hostel stair case windows and paver block works in hockey change room and covering the rcc drain covers to the storm water chambers in the campus at sai,nssc,bangalore
Read moreof your Industry type