Tender Details

Particulars Details
Title
Work Of Supply Erection Testing And Commissioning Of Single Phase 50 Hz Current Transformer
Description
Work Of Supply Erection Testing And Commissioning Of Single Phase 50 Hz Current Transformer At 220/110/33 Kv Xeldem Substation.
Organisation ELECTRICITY DEPARTMENT | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5898
EMD 0
Tender Value
Place 220/110/33KV Xeldem Substation
Link

AAAAAAAAAA

Login to view
Start Date April 30, 2025 19:30
End Date

07/05/2025 ( 8 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations

Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Read more
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.

Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.

Read more
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode

Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise