Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Aar Approved Cartridge Tapered Roller Bearings 🛠️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Issuing A Tender For The Supply Of Aar Approved Cartridge Tapered Roller Bearings, With The Last Date For Submission Being June 3, 2024, At 11:30 Am. An Earnest Money Deposit (Emd) Of Inr 51,680 Is Required For Participation. Interested Vendors Must Adhere To The Detailed Specifications And Guidelines Outlined In The Tender Document For Complete Deion. Keywords: Aar Approved, Cartridge Tapered Roller Bearings, Procurement, Ministry Of Railways, Central Government, Tender, Emd, Mumbai Cst| Particulars | Details |
|---|---|
| Title |
Aar Approved Cartridge Tapered Roller Be
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106326772 |
|
Reference Number |
93245344 |
| Tender Fee | 0 |
| EMD | 51680 |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106340749/viewNitPdf_4564971.pdf |
| Start Date | May 09, 2024 16:31 |
| End Date |
Expired
03/06/2024
Expired 824 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement (fabrication and erection) of main roller assembly with bearing of two-tier gates at okhla barrage in new delhi
Replacement (fabrication and erection) of main roller assembly with bearing of two-tier gates at okhla barrage in new delhi
Read moreConstruction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-6)
Construction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-6)
Read moreContinuation work of construction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-5)
Continuation work of construction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-5)
Read moreAdvance work to be taken for planting 2027 rains including raising of nursery work 25 ha at nkbail fsy18a1a of seabird project karwar range (ddf)
Advance work to be taken for planting 2027 rains including raising of nursery work 25 ha at nkbail fsy18a1a of seabird project karwar range (ddf)
Read moreAdvance work to be taken for planting 2027 rains including raising of nursery work 25 ha at kuntkani fs. 66 p-ii of hosakambi range (ddf)
Advance work to be taken for planting 2027 rains including raising of nursery work 25 ha at kuntkani fs. 66 p-ii of hosakambi range (ddf)
Read moreAdvance work to be taken for planting 2027 rains including raising of nursery work 25 ha at kuntkani fs. 66 p-i of hosakambi range (ddf)
Advance work to be taken for planting 2027 rains including raising of nursery work 25 ha at kuntkani fs. 66 p-i of hosakambi range (ddf)
Read moreAdvance work to be taken for planting 2027 rains including raising of nursery work 25 ha at chendiya fs. 5a1a of seabird project karwar range (ddf)
Advance work to be taken for planting 2027 rains including raising of nursery work 25 ha at chendiya fs. 5a1a of seabird project karwar range (ddf)
Read moreResurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreof your Industry type