Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Integrated Telemetry System (An223 X 11 10 02 003)
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2023/B/3624497 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 29, 2023 22:03 |
| End Date |
Expired
10/07/2023
Expired 1070 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Set of split pin for pantograph am-12. a consist of 02 items in 20 nos as follows: - (1) 4 x 45 mm cre drg. no-0103sp440 or similar. qty- 10 nos. (2) 3 x 30 mm cre drg. no-0103sp325 or similar. qty- 10 nos.
For complete deion and other details, please refer to tender
Read moreProvn o 15 x standalonel air heating system and 15 x bazooka air heating system for bldg no p-134, p-135, p-136, p-210, p-213, p-214, p-215, p-239, p342, p-455 and p-456 at jak li regt centre, srinagar under ge 970 ews
Provn o 15 x standalonel air heating system and 15 x bazooka air heating system for bldg no p-134, p-135, p-136, p-210, p-213, p-214, p-215, p-239, p342, p-455 and p-456 at jak li regt centre, srinagar under ge 970 ews
Read moreConstruction of an interlocking tile road and drainage system in ward no 02 mohalla sarai kishanchand under the municipal council dibai extending from vijaypal house to rajveer house
Construction of an interlocking tile road and drainage system in ward no 02 mohalla sarai kishanchand under the municipal council dibai extending from vijaypal house to rajveer house
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired
Read moreRfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Read moreSingle channel portable integrated ground telemetry checkout system
Single channel portable integrated ground telemetry checkout system
Read moreof your Industry type