Tender Details
About Tender
🏗️ Invitation For Bids: Pcc Floorings & Stairs Construction 🛠️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Execution Of Pcc Flooring Work In The Haulage Road Of The 8 L Drift And The Construction Of Pcc Stairs Along The Haulage And Belt Conveyor Route In The 8 L And 7 L Drifts At Gayatri Ug Mine, Rgk Sub Area, Bishrampur Area. 🏘️ 📅 Bid Submission Deadline: July 15, 2024, 5:00 Pm 💲 Earnest Money Deposit (Emd): Inr 109,000 Interested Bidders Must Submit Detailed Proposals, Including A Comprehensive Plan For The Pcc Flooring And Stairs Construction, Adhering To The Project Specifications And Timelines. Keywords: Pcc Flooring, Pcc Stairs, Construction, Secl, Coal Mine, Infrastructure, Bishrampur Area, Tender, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Pcc Flooring Work In Haulage Road In 8 L Drift And Construction Of Pcc Stairs In Haulage And Belt Conveyor Route Along 8 L And 7 L Drift For Seam 1 ( Combine To Bottom Seam I.E Seam 0 Including Material Cost At Gayatri Ug Mine Of Rgk Sub Area Of Bi
|
Description |
Pcc Flooring Work In Haulage Road In 8 L Drift And Construction Of Pcc Stairs In Haulage And Belt Conveyor Route Along 8 L And 7 L Drift For Seam 1 ( Combine To Bottom Seam I.E Seam 0 Including Material Cost At Gayatri Ug Mine Of Rgk Sub Area Of Bi
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_311725_1 |
Reference Number |
GM/BSPR/GMO/Srvy/e-tender/ 2024-25/12 dt.02.07.24 |
Tender Fee | 0 |
EMD | 10900 |
Tender Value | |
Place | GAYATRI UG MINE OF SECL BISHRAMPUR AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323057 |
Start Date | July 04, 2024 15:30 |
End Date |
15/07/2024 ( Expired 282 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreInstallation 800mm belt from 15r to 36r along -78l, -78l to-90l along 35r and dismantling of 800mm belt from 15r to 36r along -90l, dismantling of 1000mm belt from -79l to -91l in 44 seam for re-organization of belt circuit from drift and strata bunk
Installation 800mm belt from 15r to 36r along -78l, -78l to-90l along 35r and dismantling of 800mm belt from 15r to 36r along -90l, dismantling of 1000mm belt from -79l to -91l in 44 seam for re-organization of belt circuit from drift and strata bunk
Read moreDismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Read moreConstruction of 01 no. pcc foundation for installation of pump in 13d/35l and 36l in johilla bottom seam at birsinghpur colliery (ug mine) of pali sub area, johilla area
Construction of 01 no. pcc foundation for installation of pump in 13d/35l and 36l in johilla bottom seam at birsinghpur colliery (ug mine) of pali sub area, johilla area
Read moreCleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.
Cleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.
Read moreExtension of 1000mm wide belt conveyor of trunk belt conveyor tb 4 extension of tail end with conveyor structure (length 339 mtr.) and gate belt of 81l west dist.in seam 1(combined) (top seam)(length 1488 mtr.) total length 1827 mtrs. at gayatri ug m
Extension of 1000mm wide belt conveyor of trunk belt conveyor tb 4 extension of tail end with conveyor structure (length 339 mtr.) and gate belt of 81l west dist.in seam 1(combined) (top seam)(length 1488 mtr.) total length 1827 mtrs. at gayatri ug m
Read moreInstallation of 1000mm belt conveyor in proposed depillaring panel 30ln (lhcm panel) in seam-a at kurja ug mine of hasdeo area
Installation of 1000mm belt conveyor in proposed depillaring panel 30ln (lhcm panel) in seam-a at kurja ug mine of hasdeo area
Read morePreparation of marching route of proposed lhcm depillaring panel 28ls and 24ls in seam c at kurja ug mine.
Preparation of marching route of proposed lhcm depillaring panel 28ls and 24ls in seam c at kurja ug mine.
Read morePreparation of belt roadway, haulage roadway and roadway of 28ls lhcm panel in seam cat kurja sheetaldhara ug mine
Preparation of belt roadway, haulage roadway and roadway of 28ls lhcm panel in seam cat kurja sheetaldhara ug mine
Read moreof your Industry type