Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operational And Maintenance In Village Infrastructure Of Water Supply Scheme Or Arsenic Free Water Treatment Plant In Hadipur Jhikra I Gp Area
|
| Description |
Operational And Maintenance In Village Infrastructure Of Water Supply Scheme Or Arsenic Free Water Treatment Plant In Hadipur Jhikra I Gp Area
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_711818_1 |
|
Reference Number |
019/HJ-I/2024-25 |
| Tender Fee | 500 |
| EMD | 5781 |
| Tender Value | |
| Place | HADIPUR JHIKRA 1 GP |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1561006 |
| Start Date | July 11, 2024 18:45 |
| End Date |
Expired
23/07/2024
Expired 691 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Canal water based water supply project for construction of 4.00 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at bhai rupa town, district bathinda punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 4.00 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at bhai rupa town, district bathinda punjab under amrut 2.0 scheme
Read moreSupply of water material water supply scheme and 15th finance scheme in gram panchayat chacher ps mouda dist nagpur in year 2026-2027 (1st call)
Supply of water material water supply scheme and 15th finance scheme in gram panchayat chacher ps mouda dist nagpur in year 2026-2027 (1st call)
Read moreDesign, drawing, construction, testing and commissioning of sewerage system, 220 kld sewage treatment plant (stp) and 55 kld effluent treatment plant (etp) for city hospital in berhampur including operation and maintenance for a period of five years
Design, drawing, construction, testing and commissioning of sewerage system, 220 kld sewage treatment plant (stp) and 55 kld effluent treatment plant (etp) for city hospital in berhampur including operation and maintenance for a period of five years
Read moreRepair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Repair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Read moreMaintenance and water supply of the villages in shingnapur zonerectification of leakages on pvc distribution system in shingnapur zone
Maintenance and water supply of the villages in shingnapur zonerectification of leakages on pvc distribution system in shingnapur zone
Read moreRepair and maintenance of water supply distribution main, pumping main leakage and burst in ward 1 to 30 at sankarankovil municipality
Repair and maintenance of water supply distribution main, pumping main leakage and burst in ward 1 to 30 at sankarankovil municipality
Read moreDay to day maintenance repair and replacement of joinery cupboards water supply pipelines plumbing and sanitary fittings plastering flooring tiling cleaning of water tanks etc and other allied works at offrs residential area ora under age br i at ina
As per boq and tender documents
Read moreBalance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Balance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Read morePdg. supply, dismantling and installation with 5 years maintenance of street lights in 5 no. villages of block ambala-i and 5 no. villages of block ambala-ii distt ambala
Pdg. supply, dismantling and installation with 5 years maintenance of street lights in 5 no. villages of block ambala-i and 5 no. villages of block ambala-ii distt ambala
Read moreProviding fixing commissioning and testing of vacuum operated gaseous chlorination system 2000 gm per hr capacity chlorinators including supply of chlorine gas and operation maintenance of scheme for a period of 3 years complete in all respect
Providing fixing commissioning and testing of vacuum operated gaseous chlorination system 2000 gm per hr capacity chlorinators including supply of chlorine gas and operation maintenance of scheme for a period of 3 years complete in all respect
Read moreof your Industry type