Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation Of Link Road To Karkit Budgam By Way Of Balance Work
|
| Description |
Upgradation Of Link Road To Karkit Budgam By Way Of Balance Work
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2025_PWD_16636_1 |
|
Reference Number |
E tender49 of PW RnB Division 2nd kargil |
| Tender Fee | 2205 |
| EMD | 4.41 Lakh |
| Tender Value | |
| Place | kargil |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=40849 |
| Start Date | June 24, 2025 14:30 |
| End Date |
Expired
07/07/2025
Expired 379 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read morePatch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa
Patch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreUpgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Upgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreUpgradation of employment exchange road at budgam (balance portion) by way of gsb-g-ii and constr. of cc drain
Upgradation of employment exchange road at budgam (balance portion) by way of gsb-g-ii and constr. of cc drain
Read moreUpgradation of employment exchange road at budgam (balance portion) by way of gsb-g-ii and constr. of cc drain
Upgradation of employment exchange road at budgam (balance portion) by way of gsb-g-ii and constr. of cc drain
Read moreof your Industry type