Tender Details

Particulars Details
Title
Supply, Fitting And Fixing Of Electrical Items In New Training Centre Including Electrical Wiring At W.B.C.A.D.C. Ranaghat Ii Project Premises
Description
Supply, Fitting And Fixing Of Electrical Items In New Training Centre Including Electrical Wiring At W.B.C.A.D.C.&Amp#X0d Ranaghat Ii Project Premises
Organisation PANCHAYAT AND RURAL DEVELOPMENT | State Govt. and UT
Tender Id 2025_PRD_851513_1
Reference
Number
NIT-1 (2025-26) 2nd Call
Tender Fee 0
EMD 10472
Tender Value
Place WBCADC Ranaghat-II Project
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1903901
Start Date May 27, 2025 18:00
End Date

05/06/2025 ( Expired 25 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Btps(4x270mw)

Design, engineering, manufacture, supply, assembly, testing at manufacturers works, inspection, packing for inland freight, forwarding, transit insurance, delivery for site, erection, supervision, testing and commissioning of new conveying system for di of raw coal including modification works in the existing crusher house and construction of space frame structure raw coal storage shed with all accessories, mandatory spares, tools and tackles including all mechanical, electrical, cni, civil, structural works, dust suppression, dust extraction and fire fighting system at btps(4x270mw) project.

Read more
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server

Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server

Read more
Supply, installation and commissioning of server and other items at vmou kota.

Supply, installation and commissioning of server and other items at vmou kota.

Read more
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise