Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Nh 130 D Up Gradation Project 🛣️ The Ministry Of Road Transport And Highways, Specifically The Central Government's Ministry/Department, Is Seeking Bids From Eligible Contractors For The Up Gradation Of A Segment Of National Highway 130 D. The Project Involves Converting A 7.50 Km Stretch From Two Lanes To Four Lanes With A Paved Shoulder, From Gotajamhari To Akabeda, Between Km 58.100 And 65.600. 📅 Bid Submission Deadline: August 12, 2024, 5:30 Pm Tender Fee: Inr 11,800 Emd: Inr 6,23,116.50 Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, By The Stipulated Deadline. The Project Requires Adherence To The Highest Standards Of Construction And Compliance With All Relevant Regulations. Keywords: Nh 130 D, Highway Up Gradation, Infrastructure Development, Ministry Of Road Transport And Highways, Government Tender, Bid, Engineering Procurement Construction (Epc)| Particulars | Details |
|---|---|
| Title |
Up Gradation To Two Lane Four Lane With Paved Shoulder Configuration Of Gotajamhari To Akabeda In Km 58.100 To 65.600 7.50 Km Of Nh 130 D (Part 2)
|
| Description |
Up Gradation To Two Lane Four Lane With Paved Shoulder Configuration Of Gotajamhari To Akabeda In Km 58.100 To 65.600 7.50 Km Of Nh 130 D (Part 2)
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_813537_1 |
|
Reference Number |
88/CE/NH/TC/44-25/2024 |
| Tender Fee | 11800 |
| EMD | 62.31 Lakh |
| Tender Value | - |
| Place | Gotajhamari |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=855379 |
| Start Date | June 28, 2024 00:25 |
| End Date |
Expired
18/09/2024
Expired 758 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreBalance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Balance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConst. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreof your Industry type