Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Ii Dismantling Reconditioning Overhauling And Assembling Of Butterfly Valves In Mills Feeder Seal Airline During 2 A To 2 F And Fabrication Of Various Lengths Of 40 Nb Cooling Water Pipe Flange And Assembling In The 2 A
|
Description |
Mtps I Mill Plant Unit Ii Dismantling Reconditioning Overhauling And Assembling Of Butterfly Valves In Mills Feeder Seal Airline During 2 A To 2 F And Fabrication Of Various Lengths Of 40 Nb Cooling Water Pipe Flange And Assembling In The 2 A
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_498386_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.243 / 2024-25 |
Tender Fee | 0 |
EMD | 2600 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=592260 |
Start Date | November 04, 2024 18:30 |
End Date |
18/11/2024 ( Expired 223 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Mtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Read moreTtps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreMtps 1 mill plant ac plant overhauling load testing and re commissioning of 3 ton capacity eot crane and load testing of electrical hoist 1 ton capacity in air washer system unit 1 to unit 4
Mtps 1 mill plant ac plant overhauling load testing and re commissioning of 3 ton capacity eot crane and load testing of electrical hoist 1 ton capacity in air washer system unit 1 to unit 4
Read moreDismantling, removing, fabrication and erection of corroded structurals, handrails, gi gratings in clo2 plant, vam plant, so2 plant, cl2 plant and oxygen plant # 1 and 2 at pulp mill - mechanical.
Dismantling, removing, fabrication and erection of corroded structurals, handrails, gi gratings in clo2 plant, vam plant, so2 &#x0d plant, cl2 plant and oxygen plant # 1 and 2 at pulp mill - mechanical.&#x0d
Read moreDismantling, repairing and overhauling and assembling of pulley of a and b side feeder and pulley of primary crusher in pch section at sawang washery.
Dismantling, repairing and overhauling and assembling of pulley of a and b side feeder and pulley of primary crusher in pch section at sawang washery.
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26