Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Dismantling Reconditioning Overhauling And Assembling Of Butterfly Valves In Mills Feeder Seal Airline During 2 A To 2 F And Fabrication Of Various Lengths Of 40 Nb Cooling Water Pipe Flange And Assembling In The 2 A
|
| Description |
Mtps I Mill Plant Unit Ii Dismantling Reconditioning Overhauling And Assembling Of Butterfly Valves In Mills Feeder Seal Airline During 2 A To 2 F And Fabrication Of Various Lengths Of 40 Nb Cooling Water Pipe Flange And Assembling In The 2 A
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_498386_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.243 / 2024-25 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=592260 |
| Start Date | November 04, 2024 18:30 |
| End Date |
Expired
18/11/2024
Expired 697 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25
Mtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25
Read moreMtps i mill plant unit ii fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc in coal mill 2a to 2f during annual overhaul 2025 26
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc in coal mill 2a to 2f during annual overhaul 2025 26
Read moreTtps operation circle cad reconditioning of wornout 1200 nb butterfly valve for cooling water pump house ii
Ttps operation circle cad reconditioning of wornout 1200 nb butterfly valve for cooling water pump house ii
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i mill plant reconditioning of 2 nos of damaged worn out worm shafts and lock nuts for the mills 3e 2f
Mtps i mill plant reconditioning of 2 nos of damaged worn out worm shafts and lock nuts for the mills 3e 2f
Read moreof your Industry type