Tender Details

Particulars Details
Title
Consultancy Services For Authority Engineer During Operation And Maintenance Period For 2 Lane Paved Shoulder (Km. 0.00 To 63.655) Of Majhauli Charout Section Of Nh 527 C In The State Of B Ihar On Epc Basis. (Total Length In Km 63.655)
Description
Consultancy Services For Authority Engineer During Operation And Maintenance Period For 2 Lane Paved Shoulder (Km. 0.00 To 63.655) Of Majhauli Charout Section Of Nh 527 C In The State Of B Ihar On Epc Basis. (Total Length In Km 63.655)
Organisation National Highways Authority of India | RO-Patna - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 5000
EMD -
Tender Value -
Place
Link Login to view
Start Date September 28, 2026 22:30
End Date
Open 10/11/2026

28 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Read more
Consultancy services for authority engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to km. 9.260) of forbesganj to jogbani section of nh-57a in the state of bihar on epc basis. (total length in km 9.260)

Consultancy services for authority engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to km. 9.260) of forbesganj to jogbani section of nh-57a in the state of bihar on epc basis. (total length in km 9.260)

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.

Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).

Read more
Consultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.

Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707a.

Widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707ain the state of uttarakhand. (length-175 km).

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode

Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise